题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2024-01-11 05:20:43

[单项选择]Which function is not served by building a prototype ( )
A. It takes the place of the final system
B. It assists in gathering software requirements
C. It assists in estimating the cost of the project
D. It is used as the foundation of the larger projects

更多"Which function is not served by bui"的相关试题:

[单项选择]Which function is NOT served by building a prototype
A. It takes the place of the final syste
B. It assists in gathering software requirements
C. It assists in estimating the cost of the projec
D. It is used as the foundation of the larger project
[单项选择]The building, (which) roof can (be seen) here, is (the) biggest supermarket (in) town.
A. which
B. be seen
C. the
D. in
[单项选择]When ordering switches for a new building, which of the following is the BEST way for the technician to determine the number of switches to put in each network closet?()
A. Review the architectural plans to see how many drops go to each closet.
B. Count the number of rooms near each closet and standardize eight drops per room.
C. Wireless is the new standard and no network switches will be needed in the building,
D. Count the number of phone ports and configure two network ports for each phone port.
[单项选择]Which of the following best expresses the function of the first paragraph in relation to the passage as a whole
[单项选择]Which of the following BEST describes the function of a redundant power supply?()
A. Provides additional diagnostic LEDs
B. Reduces power consumption
C. Eliminates a single point of failure
D. Reduces total cost of ownership
[单项选择]Which function enforces logical data throughput rates that are below the actual physical line rate of a port?()
A. rate limiting
B. data policing
C. classification
D. bandwidth limiting
[单项选择]Which statement describes the function of the LNS in a L2TP environment?()
A. It initiates both the PPP session and the tunnel.
B. It initiates the PPP session and terminates the tunnel.
C. It terminates the PPP session and initiates the tunnel.
D. It terminates the PPP session and terminates the tunnel.
[单项选择]Which of the following is NOT the function of the ON
A. It serves ns a military organizations.
B. It serves as a symbol of international order.
C. It promotes economic and social progress.
D. It coordinates the work of agencies.
[单项选择]Which UTM feature requires a license to function?()
A. integrated Web filtering
B. local Web filtering
C. redirect Web filtering
D. content filtering
[单项选择]Which of the following best describes the function of the last paragraph in relation to passage as a whole
[多项选择]Which three are necessary for antispam to function properly on a branch SRX Series device? ()(Choose three.)
A. an antispam license
B. DNS servers configured on the SRX Series device
C. SMTP services on SRX
D. a UTM profile with an antispam configuration in the appropriate security policy
E. antivirus (full or express)
[单项选择]Which of the following is the function that nanoscale motors perform
A. rearranging individual atoms
B. manipulating individual atoms
C. producing products and process
D. photosynthesis and muscle concentration
[单项选择]Which section of the tapeworms has the function of growth
A. the neck
B. the scolex
C. the immature proglottids
D. the mature proglottids
E. the gravid proglottids

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码