[单项选择]Analogous estimating ().
A. uses bottom-up estimating techniques
B. uses the actual cost of previou similar projects as the basis for estimating the cost of the current project
C. is used most frequently in the later stages of a project
D. summarizes estimates for individual work items

更多"Analogous estimating ()."的相关试题:

[单项选择]Which of the following is most clearly analogous to the example in the passage of the person who fears dogs
A. A child chokes on a fishbone and as an adolescent is reluctant to eat fish.
B. A person feels lonely and after a while buys a dog for companionship.
C. A child studies science in school and later grows up to become a teacher.
D. A person hears that a snowstorm is predicted and that evening is afraid to drive home.
[单项选择]Which of the following is most nearly analogous in its cause and condition to the problems which the author describes as limiting the present success of African- American cinema
[单项选择]Which of the following would be most analogous to the process of dampening oscillations described in the paragraph
A. (A) During a rainstorm, water rises to the level of a sewer drain, siphoning off and thus remaining at constant level.
B. (B) A rubber ball which bounces off the ground multiple times, than gradually comes to rest.
C. (C) A meteor hurtles through space indefinitely, due to the laws of inertia.
D. (D) A clothing iron is left on, then becomes so hot that it catches on fire, burning its own cord and destroying its power source.
E. (E) A baseball pitcher knows he tends to through to the left of home plate, and then in trying to throw to the right, overcorrects.
[单项选择]Which of the following is most analogous to the fate that the experimental films, described above, have received as a result of their association with Eisenstein's work
[名词解释]同功器官(analogous organ )
[单项选择]______is one of the techniques used for estimating activity durations.
A. Analogous Estimating
B. Precedence Diagramming Method(PDM)
C. Dependency Determination
D. Schedule network Templates
[单项选择]Estimating activity durations uses information on activity scope of (74), required resource types, estimated resource quantities, and resource calendars.
A. milestone
B. baseline
C. quality
D. work

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码