[单项选择]The measure used to forecast project cost at completion is ().
A. CPI
B. SPI
C. BCWP
D. ACWP

更多"The measure used to forecast projec"的相关试题:

[单项选择]A project was expected to cost $6 million for 3 months. At the end of 1 month, you use earned value as a performance management tool and get the following information: BCWP=$1.5 million, BCWS=$2.5 million, ACWP=$2.2.million. What is the schedule variance ?()
A. $0.3 millio
B. $-1 millio
C. $1 million。
D. $0.7 millio
[单项选择]Who is responsive for determining the project cost variance acceptable range ?()
A. Functional manage
B. Upper managemen
C. The custome
D. The project manage
[单项选择]In which phase of the project life cycle,are cost and staffing levels high ?()
A. Intermediate stag
B. Final stag
C. Pre-intermediate stag
D. Initial stag
[单项选择]When the project cost is $2000 and the profit is $500,what is the BCR for the project ?()
A. 2500.
B. 25%.
C. 4.
D. not enough information to calculate BC
[单项选择]Discards have been used by the Garbage Project to study ______.
A. the proportion of materials which break down within landfills
B. how much people eat and drink in their daily lives
C. the fluids that leak out of MSW landfills
D. how to compose the landfill wasters
[多项选择]Which three BGP states follow the successful completion of the underlying TCP connectivity? ()(Choose three.)
A. Idle
B. Connect
C. Open Sent
D. Established
E. Open Confirm
[单项选择]The general manager demanded the job will be completed before the National Day().
A. would be completed
B. must be completed
C. had to be completed
D. be completed
[单项选择]If the child suffers aphasia, he can recover completely _____
A. before the onset of puberty
B. after age eighteen
C. before age two
D. after puberty
[单项选择]Anna was reading a piece of science fiction, completely ________ to the outside world.
A. having been lost
B. to be lost
C. losing
D. lost
[单项选择]Jane was reading a piece of science fiction, completely ______ to the outside world.
A. being lost
B. having lost
C. losing
D. lost
[单项选择]The project manager can enhance project communications and team building by doing all the following except______.
A. having a“war room”
B. being a good communication blocker
C. being a communication expeditor
D. holding effective meetings
[单项选择]This sum of money played a vital role in the completion of the project, ______ it, the project would not have been completed so successfully.
A. With
B. Without
C. Except for
D. But that
[单项选择]The headmaster asked the students (who) (had completed) their tests (to leave) the classroom as (quieter) as possible.
A. who
B. had completed
C. to leave
D. quieter
[单项选择]The first year of the college life is a very complex ______ period, and the more fully the freshmen prepare for it, the better.
A. transmission
B. transposition
C. transformation
D. transition
[单项选择]The project sponsor has just provided the project charter.What is the NEXT thing to do ?()
A. Begin to complete work package
B. Complete scope verificatio
C. Start integrated change contro
D. Start to create management plan

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码