[单项选择]An outputs from the quality planning process is ______ .
A. quality improvements
B. quality management plan
C. acceptance decisions
D. rework

更多"An outputs from the quality plannin"的相关试题:

[单项选择]()is one of the quality planning outputs.
A. Scope base line
B. Cost of quality
C. Product specification
D. Quality checklist
[单项选择]Outputs from risk response planning include all of the following EXCEPT______.
A. risk register updates
B. corrective actions
C. risk-related contractual agreements
D. project management plan updates
[单项选择]In quality planning:
A. The primary benefit of meeting quality requirements is the reduced expense associated with project quality management activitie
B. Cost-benefits tradeoffs must be considere
C. The primary cost of meeting quality requirements is increased rewor
D. Benefits cannot be evaluated in relation to cost
[单项选择]During the project scope planning process, the work breakdown structure should be developed to ______ .
A. the sub-project level
B. the level determined by the project office
C. a level allowing for adequate estimates
D. the cost center level
[单项选择]The project (73)is a key input to quality planning since it documents major project deliverables, the project objectives that serve to define important stakeholder requirements, thresholds, and acceptance criteria.
A. work performance information
B. scope statement
C. change requests
D. process analysis
[多项选择]Process OSPF 1 is redistributing routes from process OSPF 2. Which of the following methods may be used to set the metrics of the redistributed routes?()
A. Let the metrics default.
B. Use each redistributed route's OSPF metric using the redistribute command's metric transparent keywords.
C. Set the metric using the default - metric router subcommand.
D. Redistribution is not allowed between two OSPF p rocesses.
[多项选择]Process EIGRP 1 is redistributing routes from process OSPF 2. Which two of the following methods may be used to set the metrics of the redistributed routes?()
A. Let the metrics default.
B. Set the metric components using the redistri bute command's metric keyword.
C. Set the metric components using the default - metric router subcommand.
D. Set the integer (composite) metric using the redistribute command's metric keyword.
[单项选择]China's tea is of superior quality ( ) from other countries.
A. to those
B. to that
C. than that
D. than those
[单项选择]Improved quality of facial tissues resulted from ______.
A. mass—production methods
B. popular demand for a better product
C. a decrease in production costs
D. competition among manufacturers
[单项选择]We learn from the passage that the process of industrialization in Europe ______.
A. was accompanied by an increased number of workshop accidents
B. resulted in the development of popular social insurance programs
C. required workers to be aware of the potential dangers at the workplace
D. met growing resistance from laborers working at machines
[单项选择]From the passage we know the quality of the products ________.
A. is as high as before
B. is lower
C. is improved
D. is reduced
[单项选择]Risk identification outputs include the following except______.
A. decision trees
B. inputs to other processes
C. risk symptoms
D. potential risk events
[单项选择]Cost control outputs include all of the following EXCEPT ().
A. estimate at completion
B. budget updates
C. revised cost estimates
D. cost baseline
[单项选择]All of the following are outputs of human resource planning EXCEPT ______
A. roles and responsibilities
B. project organization charts
C. staffing management plan
D. project interfaces
[单项选择]英译汉:“quality management;quality control;quality certification mark”,正确的翻译为()
A. 质量管理;质量控制;质量标志
B. 质量标志;质量控制;质量管理
C. 质量标志;质量管理;质量控制
D. 质量控制;质量管理;质量标志
[单项选择]In roiling wave planning:
A. Focus is maintained on long-term objectives, allowing near-term objectives to he roiled out as part of the ongoing wave of activitie
B. The work to be accomplished in the near term is planned in detail at a low level of the WB
C. The work far in the future is planned in detail for WBS components that are at a low level of the WB
D. A wave of detailed activities is planned during strategic planning to ensure that project milestones are achieve
[单项选择]Document outputs are produced on (), devices that produce text or images on paper.
A. display and keyboard
B. mouse and keyboard
C. scanners and plotters
D. printers and plotters
[单项选择]Document outputs are produced on (75) , devices that produce text or images on paper.
A. mouse and keyboard
B. scanners and plotters
C. display and scanners
D. printers and plotters

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码