题目详情
当前位置:首页 > 计算机考试 > 初级程序员
题目详情:
发布时间:2023-10-23 17:00:22

[单项选择]integration()is the process of verifying that the components of a system work together as described in the program design and system design specifications.
A. trying
B. checking
C. testing
D. coding

更多"integration()is the process of veri"的相关试题:

[单项选择]Integration ( ) is the process of verifying that the components of a system work together as described in the program design and system design specifications.
A. trying
B. checking
C. testing
D. coding
[单项选择]Integration ______ is the process of verifying that the components of a system work together as described in the program design an system design specification.
A. trying
B. checking
C. testing
D. coding
[单项选择]A network administrator is verifying the configuration of a newly installed host by establishing an FTP connection to a remote server. What is the highest layer of the protocol stack that the nework administrator is using for this operation?()
A. application
B. presentation
C. session
D. transport
E. internet
F. data link
[单项选择]When verifying a new wireless installation the administrator is unable to see a wireless signal withany wireless laptop. The MOST likely problem is:()
A. The SSID is not set to broadcast
B. An incorrect channel is being used
C. Incorrect client security settings are configured
D. Incorrect client configuration on the laptops
[单项选择]When verifying OSPF virtual link problems, which is an important item to check on the two transit OSPF routers?()
A. OSPF process ID
B. OSPF router ID
C. OSPF network type
D. OSPF memory usage
E. OSPF CPU utilization
F. OSPF stub area configurations
[多项选择]When verifying the OSPF link state database, which type of LSAs should you expect to see within the different OS PF area types?()
A. All OSPF routers in stubby areas can have type 3 LSAs in their database.
B. All OSPF routers in stubby areas can have type 7 LSAs in their database.
C. All OSPF routers in totally stubby areas can have type 3 LSAs in  their database.
D. All OSPF routers in totally stubby areas can have type 7 LSAs in their database.
E. All OSPF routers in NSSA areas can have type 3 LSAs in their database.
F. All OSPF routers in NSSA areas can have type 7 LSAs in their database.
[单项选择]School integration plans that involve busing between suburban and central-city areas have contributed, according to a recent study, to any future need for busing.
A. significant increases in housing integration, which, in turn, reduces
B. significant integration increases in housing, which, in turn, reduces
C. increases housing integration significantly, which, in turn, reduces
D. increases housing integration significantly, which, in mm, reduce
[单项选择]Integration is done by the ().
A. project manager
B. team
C. sponsor
D. stakeholders
[多项选择]Which three types of integration does the Business Event System support?() (Choose three.)
A. point-to-point
B. parent/child messaging
C. messaging hub system
D. distributed applications messaging
E. simple object access protocol (SOAP) messaging
[单项选择]The maturity of IT industry and the integration of IT into the mainstream of economic activity and ______ constraints have forced the authority to rethink its role.
A. budgetary
B. documentary
C. commentary
D. portray
[单项选择]The integration of staff for training has led to a good exchange of ideas, greater enthusiasm, and higher staff ______.
A. moral
B. mortal
C. morale
D. mores
[单项选择]The influence of socialization process may
[单项选择]Integration between () multidata sources and () is defined as the Grid Link for RAC.
A. Oracle WebLogic Server; Oracle Database
B. Oracle WebLogic Server clusters; Oracle Database
C. Oracle WebLogic Server clusters; Oracle Database RAC
D. Oracle OC4J; Oracle Database RAC
E. Oracle WebLogic Server; Oracle OC4J
[单项选择]The Estimate Activity Resource process is closely coordinated with the (73)process.
A. Estimate Costs
B. Sequence Activities
C. Plan Communications
D. Conduct Procurements
[单项选择]Which of the following process involves determining project roles,responsibilities,and reporting relationships,and develops the staffing management plan ?()
A. Manage project tea
B. Human resource plannin
C. Develop project tea
D. Acquire project tea
[单项选择]The process is primarily concerned with authorizing the project or, in a multiphase project, a project phase is called ______ .
A. develop project charter
B. develop prepliminary project scope statement
C. management review
D. phase-end review

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码