题目详情
当前位置:首页 > 学历类考试 > 博士考试
题目详情:
发布时间:2023-10-07 19:02:15

[单项选择]Building this road will ______ the construction of ten bridges, then the total cost reaches 1 million US Dollars.
A. evolve
B. involve
C. revolve
D. devolve

更多"Building this road will ______ the "的相关试题:

[单项选择]Building this road will ______ the construction of ten bridges, and then the total cost reaches 1 million US dollars.
A. evolve
B. involve
C. revolve
D. devolve
[单项选择]Before the construction of the road, it was prohibitively expensive to transport any furs or fruits across the mountains.
A. determinedly
B. incredibly
C. amazingly
D. forbiddingly
[单项选择]Construction of the gigantic office building in this city was for years intermittent .
A. stopping and starting at intervals
B. something that will happen soon
C. being watched with keen interest
D. anything that comes and goes
[单项选择]The building of the road ______ by bad weather.
A. has held up
B. has been held up
C. was held
D. hold up
[单项选择]Meantime, road construction is ______ on the site of a proposed Tuman River Triangle.
A. under way
B. in the way
C. of the way
D. by way
[单项选择]The building of the new road has been ______ by bad weather.
A. held out
B. held to
C. held in
D. held up
[单项选择]The building of the new road has been ________ by bad weather.
A. set down
B. held up
C. kept down
D. stood back
[单项选择]The building of the new road has been________ by bad weather.
A. held off
B. held down
C. held in
D. held up
[单项选择]How many building places does the Building Service look at each month to see if things are going on well

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码