更多"The members in the testing team wer"的相关试题:
[单项选择]The members in the testing team were quite _______ and could change their schedule upon request.
A. lenient
B. supple
C. flexible
D. gentle
[单项选择]In a project, two team members were using different versions of WBS. Team members could not know the status of project management plan documents. Project manager should FIRST check______.
A. configuration management system
B. work performance information
C. change control system
D. information gathering and retrieval systems
[单项选择]According to the passage, testing team at the University of Iowa is the first to ______.
A. develop a method to test hearing by way of the brain
B. determine the extent of brain damage in hearing-impaired persons
C. observe the reaction of the brain to a laboratory-controlled noise
D. study all the parts of brain-wave responses at the same time
[单项选择]The fact that key members of team that built America's first nuclear bomb were foreigners is used to ______.
A. prove that foreign experts are important for the U. S.
B. prove visa system used to be more effective in the past
C. show that visa system was not really necessary in the past
D. explain that countries have always been competing for professions
[单项选择]The members of parliament were ______ that the government had not consulted them.
A. tolerant
B. indignant
C. crude
D. impatient
[单项选择]They were obviously quite impressed by the arguments that the Chinese were advancing,
A. 他们对中国人提出的这些论点显然颇为赞同。
B. 他们对中国人正在前进的这种论点显然是赞同的。
C. 显然,他们深深知道, 中国人会作出这种进步的。
D. 显然,他们对中国人提出了这种争论而深有印象。
[单项选择]The members of the House of Commons were shocked when the opposition speaker the character of the Prime Minister.
A. mentioned
B. disputed
C. lauded
D. doubted
[单项选择]Project team members are drawn from all available sources, both internal and external. When the project management team is able to influence or direct staff assignments, characteristics to consider include all of the following EXCEPT ______ .
A. availability
B. political philosophy
C. ability
D. experience
[单项选择]10 members were assigned in advance to your project team. This pre-assignment could because of all the following reasons EXCEPT:
A. People were promised as part of a competitive proposa
B. Suitable people came forward and mentioned that they wanted to work on the projec
C. Staff assignments were defined in the project charte
D. Project is dependent on the expertise of some of the pre-assigned person
[单项选择]Staff members were asked to work on Sundays, with the ______ that they would lose their jobs if they refused.
A. implication
B. illustration
C. implement
D. petition