[单项选择]A project schedule completion date will change if ______ .
A. the critical path is reduced
B. the contingency is no longer available
C. no float time is available
D. project resources are reduced

更多"A project schedule completion date "的相关试题:

[单项选择]Completion of project scope activities is not measured against the ______ .
A. scope statement
B. requirements
C. WBS dictionary
D. WBS
[单项选择]A manufacturing project has a schedule performance index(SPI)of 0.89 and a cost performance index(CPI)of 0.91.Generally,what is the BEST explanation for why this occurred ?()
A. The scope was change
B. A supplier went out of business and a new one needed to be foun
C. Additional equipment needed to be purchase
D. A critical path activity took longer and needed more labor hours to complet
[单项选择]The method of constructing a project schedule network diagram that represents activities and connects then to show the all dependencies is known as ().
A. precedence diagramming method
B. activity list
C. arrow diagramming method
D. schedule network templates
[单项选择]Your schedule analysis has shown that your project has a high likelihood of experiencing a schedule overrun. You know this because the cumulative EV is much ______ .
A. higher than the cumulative AC
B. higher than the cumulative PV
C. lower than the cumulative PV
D. lower than the cumulative CPI
[单项选择]Project schedule management is made up of six management processes including: activity definition, activity sequencing, ( 71) , and schedule control by order.
A. activity duration estimating, schedule developing, activity resource estimating
B. activity resource estimating, activity duration estimating, schedule development
C. schedule developing, activity resource estimating, activity duration estimating
D. activity resource estimating, schedule developing, activity duration estimating
[单项选择]A detailed project schedule can be created only after creating the ().
A. project budget
B. work breakdown structure
C. project management plan
D. detailed risk assessment
[单项选择]The high-level project schedule constraints have just been determined.What project management process group are you in ?()
A. Initiatin
B. Plannin
C. Executin
D. Monitoring and controllin
[单项选择]Your project is behind schedule due to conflict between team members. Having resolved the conflict, to get the project back on schedule, you should consider ______ .
A. crashing the schedule
B. performing resource leveling
C. conducting reverse resource allocation scheduling
D. utilizing the critical chair resources
[单项选择]A request for the teacher to change the date of the exam is sent to the office.
A. 老师把改变考试日期的要求送往办公室。
B. 希望老师改变考试日期的请求被送往办公室。
C. 要求改变考试时间的那名老师被派往办公室。
D. 老师希望通知办公室考试日期有所变更。
[单项选择]The schedule control process for a project ______ .
A. focuses on starting the project earlier than scheduled
B. is necessary for controlling changes to the project schedule
C. is concerned only with activities that are on the critical path
D. should focus entirely on activities that are difficult to carry out
[单项选择]The project manager has just received a change from the customer that does not affect the project schedule and is easy to complete.What should the project manager do FIRST ?()
A. Make the change happen as soon as possibl
B. Contact the project sponsor for permissio
C. Go to the change control boar
D. Evaluate the other components of the“triple constraint”.
[单项选择]Sentence Completion
A. manifested...spontaneity
B. lampooned...theatricality
C. cultivated...orthodoxy
D. disavowed...histrionics
E. (E) betrayed...burlesque
[单项选择]已知PROJECT(J#,JNAME,DATE),要求若没有视图或约束引用属性DATE,则删除该列,若有视图或约束引用该属性,则不删除该列。可实现上述语义的语句是______。
A. DELETE TABLE PROJECT DROP DATE CASCADE
B. DELETE TABLE PROJECT DROP DATE RESTRICT
C. ALTER TABLE PROJECT DROP DATE CASCADE
D. ALTER TABLE PROJECT DROP DATE RESTRICT
[单项选择]The project manager can enhance project communications and team building by doing all the following except______.
A. having a“war room”
B. being a good communication blocker
C. being a communication expeditor
D. holding effective meetings

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码