题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2023-10-23 02:17:31

[单项选择]The failure of the project might be _______ to a lack of funds.


A. contributed
B. attributed
C. distributed
D. dedicated

更多"The failure of the project might be"的相关试题:

[单项选择]The failure of the project might be _______ to a lack of funds.


A. contributed
B. attributed
C. distributed
D. dedicated
[单项选择]The probability of failure for a project element is often called exposure to risk,or risk exposure.This exposure may be mitigated by taking measure to avoid a particular approach or use of specific technologies.When the risk exposure cannot be reduced through selection of another alternative,the project manager should ().
A. conduct further studies and analysis until a more attractive alternative is found
B. disregard the exposure to risk because nothing can be done
C. not performs the activities with risk exposure and save the money which would have been spent on them
D. establish a contingency plan to overcome any adverse activity.which may include a contingency allowance
[单项选择]According to the passage, the oil industry might lead in Northern Norway to


A. the development of industry
B. a growth in population
C. the failure of the development program
D. the development of new towns
[单项选择]I have to be honest that your latest project has little______ of success.


A. prediction
B. prophecy
C. prospect
D. prestige
[单项选择]The Great Ape Project believes that apes deserve legal protection because.


A. they are very much like humans
B. they are conscious of things
C. they are natural animals and should be protected
D. they are free from imprisonment ad torture
[多项选择]下面是三个DRA命令: ADVISE FAILURE; LIST FAILURE; REPAIR FAILURE; 必须按什么顺序运行它们来修复问题(选择一个最佳答案)?
A. ADVISE,LIST,REPAIR
B. LIST,ADVISE,REPAIR
C. LIST,REPAIR(ADVISE不是必需的)
D. ADVISE,REPAIR(LIST不是必需的)
[单项选择]As a project manager,project plan development is an important element of managing projects.Which phase of the project management life-cycle does project plan development belong to ?()
A. Initiation process
B. Planning process
C. Execution process
D. Controlling process
[单项选择]You are the project manager of a new project, which will construct a bridge on the River Nile in Egypt. Before initiating the project, you should ().
A. create a scope management plan to document:how the project scope will be defined, verified and controlled
B. develop a project management plan
C. determine specific activities that need to be performed to produce the various project deliverables
D. facilitate the formal authorization to start a new project
[单项选择]You are a project manager for a small project.Your project was budgeted for ¥500,000 over a six-week period.As of today,you've spent ¥260,000 of your budget to complete work that you originally expected to cost ¥280,000.According to your schedule,you should have spent ¥300,000 by this point.Based on these circumstances,your project could be best described as ().
A. ahead of schedule
B. behind schedule
C. on schedule
D. having not enough information provided
[单项选择]Failure to effectively deal with interpersonal conflict in the workplace could ______.


[单项选择]How long did the power failure last


A. Nearly 12 hours.
B. More than 12 hours.
C. Nearly 24 hours.
D. More than 24 hours.

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码