[单项选择]A project planning methodology is any structured approach used to guide the project team during development of the project plan. What is an example of this methodology
A. Standard forms or templates.
B. Upper management involvement.
C. Functional work authorizations.
D. Stakeholders skills.

更多"A project planning methodology is a"的相关试题:

[单项选择]

()Development is a structured design methodology that proceeds in a sequence from one phase to the next.


A. Waterfall
B. Phased
C. Prototyping
D. Parallel
[单项选择]Having the client assist in the project planning ______.
A. is not always recommended since the client does not have adequate knowledge of project management
B. enables better planning since they are familiar with project insights
C. provides only some understanding, but usually the client dealing with the project has only limited authority
D. usually confuses the situation
[单项选择]During the project scope planning process, the work breakdown structure should be developed to ().
A. the sub-project level
B. the level determined by the project office
C. a level allowing for adequate estimates
D. the cost center level
[单项选择]

Traditional structured analysis techniques focus upon the flow of (71) within a system. Object-oriented analysis emphasizes the building of real-world models. It examines requirements from the perspective of the classes and objects found in the vocabulary of the (72) domain. Traditional system design method emphasizes the proper and effective structure of a complex system. Object-oriented design method encompasses the process of object-oriented decomposition and a (73) for depicting both logical and physical as well as static and dynamic models of the system under design. Object-oriented programming is a method of implementation in which programs are organized as cooperative collections of objects, each of which represents an (74) of some class, and whose classes are all members of a hierarchy of classes united via (75) relationships.

(71)处填()。
A. control
B. program
C. data
D. reference
[简答题]Scientific methodology is based on generating hypotheses and testing them to see if they make sense; in laboratories throughout the world, researchers spend at least as much time trying to disprove a theory as they do trying to prove it. Eventually, those ideas that don’t prove false are accepted. But fingerprinting was developed by the police, not by scientists, and it has never been subjected to rigorous analysis—you cannot go to Harvard, Berkeley, or Oxford and talk to the scholar working on fingerprint research. Yet by the early twentieth century, fingerprinting had become so widely accepted in American courts that further research no longer seemed necessary, and none of any significance has been completed.
The discussion of fingerprinting is only the most visible element in a much larger debate about how forensic science fits into the legal system. For years, any sophisticated attorney was certain to call upon expert witnesses to assert whatever might help his cas
[简答题]B. financial planning
[单项选择]The previous project manager for your project managed it without much project organization. There is a lack of management control and no clearly defined project deliverables. Which of the following would be the BEST choice for getting your project better organized
A. Adopt a life cycle approach to the project.
B. Develop lessons learned for each phase.
C. Develop specific work plans for each work package.
D. Develop a description of the product of the project.
[单项选择]While completing a project a project manager realizes be needs to decrease project costs. After researching his options, he comes up with the following choices. Which choice would DECREASE project costs ?()
A. Change to component A from component B. Component A costs more to purchase but has a lower life cycle cost than B
B. Change task A to be completed by resource B instead of Resource C, Resource B is a more experienced worker
C. Move tasks B and H to occur concurrently, and take the risk of a 30% increase in the need for five more resources later
D. Remove a test from the project plan
[单项选择]"The novel is structured around the discovery of the hero's origin." The novel probably refers to ______.


A. Wuthering Heights
B. History of Tom Johns, a Foundling
C. David Copperfield
D. Gulliver’s Travel
[单项选择]The project charter is created in which project management process group ?()
A. Executing
B. Planning
C. Closing
D. Initiating
[单项选择]For a well planned project the project schedule is ______.
A. the agenda for carrying out the plan or a portion of it
B. not important, as each team member acts according to plan
C. used to generate a time table of major commitments for the project
D. both A and C
[单项选择]Being assigned as the project manager to a project you perform earned value Analysis and find the following results:EV=250000;PV=200000;AC=275000;BAC=500000.What is right ?()
A. EAC=400000
B. EAC=550000
C. BTC=400000
D. ETC=75000
[单项选择]Being the project manager in a software project which is currently initiated,you want to assess high level risks.What should you do ?()
A. Develop a preliminary scope statement and document initially identified risks in this document
B. Identify and analyze risk events using qualitative and quantitative techniques
C. Develop contingency plans and fallback plans in case the original plan proves Wrong
D. Discuss the risks documented in your risk register with the project key stakeholders

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
  • 支付完成
  • 取消支付
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码