题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2023-11-03 22:00:18

[简答题]Task II: Your class has recently had a discussion about testing. For homework, your teacher has asked you to write a composition in no less than 120 words, giving your opinion about the following statement: A test can tell the whole story. Please write your composition on the Answer Sheet. (20 points)

更多"Task II: Your class has recently ha"的相关试题:

[多项选择]Task II: Your class has recently had a discussion about practical ability for college students. For homework, your teacher has asked you to write a composition in no less than 120 words, giving your opinion about the following statement:   Practical ability is also important for college students.   Please write your composition on the Answer Sheet. (20 points)
[多项选择]There has been a discussion recently on the issue in a newspaper. Write an essay to the newspaper to 1)show your understanding of the symbolic meaning of the picture below, 2)give a specific example, and 3)give your suggestion as to the best way to show love. You should write about 200 words on ANSWER SHEET 2.[*]          
[简答题]

Task II
Directions:Some people say television has altered family life dramatically.Write an article for your school magazine,putting forward your views.You should write about 160 words on the Answer Sheet。


[单项选择]Task A has the following details:Optimistic estimate=30, pessimistic estimate=40, most likely estimate=35. Task B has the following details:Optimistic estimate=32, pessimistic estimate=37, most likely estimate=34. Task C has the following details:Optimistic estimate=25, most likely estimate=35, pessimistic estimate=45. Which task has the highest standard deviation ()
A.  Task A. 
B. Task B. 
C. Task C. 
D. D. Task A & Task
[单项选择]If task A has seven days of free float and 15 days of total float and the early start date is delayed 5 days, what does this do to the completion date of the project
[单项选择]If Task B has 15 days of free float and 25 days of total float, and the early start date of Task B is delayed 30 days, how is the project affected
[填空题]What American has had the largest family
[单项选择]If Task C has 0 days of free float and 0 days of total float, what does this mean to the project
A. The project does not have adequate lead and lag times built in.
B. The task is on the critical path.
C. The duration of the task should be compressed.
D. The dates for the task are not accurate.
[填空题]Everyone has had this experience of losing attention, but probably few people understand one of the main reasons why we have this trouble keeping our attention on the speaker. The reason is this: There is a great deal of difference between talking speed and listening speed. The result of this gap is that we have a lot of (36) time to use while listening to a (37) .
Here are three mental techniques you can use to keep your (38) on the speaker. First of all, (39) what the speaker has said. Do this after each new point is developed. This (40) summarizing will help you pay attention. Second, try to guess where the speaker is going next. Try to (41) what direction the speaker is going to take, based on what has already been said. This game you play with yourself arouses your curiosity and helps (42) your attention. Third, question the truth, the (43) , of the speaker’s words. Keep trying to decide

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码