题目详情
当前位置:首页 > 外贸类考试 > 外销员
题目详情:
发布时间:2023-10-15 12:22:49

[单项选择]When()the contract, please include the arbitration clause.
A. draft
B. drafting
C. todraft
D. drafted

更多"When()the contract, please include "的相关试题:

[单项选择]When()the contract,please include the arbitration clause.
A. draft
B. drafting
C. to draft
D. drafted
[单项选择]Please effect payment when the draft().
A. expires
B. due
C. fallsdue
D. fallsexpiration
[简答题]术语翻译:Breach of contract()
[单项选择]

Contract closeout is a process that involves()


A. Customer satisfaction analysis and final payment
B. Administrative closeout and archiving records
C. Finial contractor payment and Lessons learned
D. Product verification and administrative closeout
[单项选择]()is the general meaning of the contract bill note and proof in the process of logistics.
A. logistics activity 
B. logistics documents 
C. logistics paper 
D. documents
[单项选择]Jim was about to sign the contract but I().
A. put him through
B. turned him out
C. gave him up
D. cut him short
[单项选择]()is the general meaning of the contract, bill, note and proof in the process of logistics.
A. Logistics activity    
B. Logistics documents    
C. Logistics  paper   
D. Documents
[单项选择]

Project Quality Management processes include all the activities of the()that determine quality policies, objectives and responsibilities so that the project will satisfy theneeds for which it was undertaken.


A. Project
B. project management team
C. performingorganization
D. customer
[多项选择]Transport agencies include air and surface().
A. freightforwarders
B. shipper'sassociations
C. insurancebrokers
D. transportationbrokers
[单项选择]The advantages of () include better accuracy, customer service, precise control of transportation and data analysis capabilities to anyone capable of using the virtual database.
A. GPS
B. Information system
C. Virtual warehousing
D. Communication system
[单项选择]When the renewal verification is completed more than three months before the expiry date of the existing Document of Compliance or Safety Management Certificate, the new Document of Compliance or the new Safety Management Certificate should be valid from the date of () for a period not exceeding five years.
A. beginningoftherenewalverification
B. completionoftherenewalverification
C. beginningofscheduleddrydocking
D. completionofscheduleddrydocking
[单项选择]Please reply to our inquiry()your earliest convenience.
A. by
B. upon
C. for
D. at
[单项选择]$include可以加载哪些文件()
A. javascript脚本和css样式
B. html文件
C. jsp文件
D. java文件
[单项选择]THE MASTER WHEN CALL TO THE BRIDGE AND TAKING OVER THE CONN. FROM THE OFFICER OF THE WATCH , SHOULD SAY().
A. I NOW HAVE THE WATCH.
B. I NOW HAVE THE CONN.
C. YOU NOW HAVE THE WATCH.
D. YOU NOW HAVE THE CONN.
[单项选择]

When the system upon which a transport entity is running fails and subsequently restarts,the(21) information of all active connections is lost. The affected connections become half-open, as the side that did not fail does not yet realize the problem.The still active side of a half-open connections can close the connection using a(22)timer. This timer measures the time the transport machine will continue to await an (23) of a transmitted segment after the segment has been retransmitted the maximum number of times.When the timer (24),the transport entity assumes that either the other transport entity or the intervening network has failed. As a result, the timer closes the connection, and signals an abnormal close to the TS user. In the event that a transport entity fails and quickly restarts, half-open connections can be terminated more quickly by the use of the RST segment, the failed side returns an RST i to every segment i that it receives. When the RST i reaches the other side,
A. give-up
B. abandon
C. quit
D. connection

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码