题目详情
题目详情:
发布时间:2023-10-26 01:02:41

[单项选择]

A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved.

空白(1)处应选择()
A. phases
B. processes
C. segments
D. pieces

更多"A project life cycle is a collectio"的相关试题:

[单项选择]

A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved.


空白(2)处应选择()
A. plan
B. fraction
C. main
D. framework
[名词解释]Life cycle 生活史
[名词解释]Menstrual cycle
[名词解释]

英译中:Cycle stock


[名词解释]

英译中:Order cycle time


[名词解释]

英译中:Inventory cycle time


[名词解释]life expectancy
[名词解释]life table
[名词解释]abridged life table
[名词解释]current life table
[名词解释]

英译中:Goods collection


[单项选择]

Project selection methods involve measuring value or attractiveness to the project owner or sponsor and may include other organizational decision criteria ()is not a project selection method.


A. Benefitcontribution
B. Expertjudgment
C. Scoringmodels
D. Flowcharting
[名词解释]英译中:Automatic Data Collection
[单项选择]

Project work packages are typically decomposed into smaller components called activities to provide a basis for()scheduling, executing, and monitoring and controllingthe proj ect work.


A. reviewing
B. estimating
C. auditing
D. expecting
[单项选择]

Project Quality Management processes include all the activities of the()that determine quality policies, objectives and responsibilities so that the project will satisfy theneeds for which it was undertaken.


A. Project
B. project management team
C. performingorganization
D. customer
[单项选择]

Project Quality Management must address the management of the project and the()ofthe project. While Project Quality Management applies to all projects,regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.


A. performance
B. process
C. product
D. object
[名词解释]cause eliminated life table
[单项选择]CYCLE97指令,主要用于()的加工,以简化编程(SIEMENS系统)。
A. 切槽
B. 钻孔
C. 端面
D. 螺纹

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码