更多"[单选题]The exhaust gases for a new en"的相关试题:
[单选题]The exhaust gases should be almost invisible when the engine operates
A.under full load
B.under half load
C.overloaded
D.without any load
[单选题]英文缩写BEW代表的是:()。
A.干操作重量
B.飞机基本空重
C.飞机的基本重量
D.使用空重
[判断题]飞机基本重量的英文缩写是BEW。()
A.正确
B.错误
[判断题]英文缩写BEW代表的是飞机基本重量。()
A.正确
B.错误
[判断题]飞机基本空重的英文缩写是BEW。()
A.正确
B.错误
[判断题]英文缩写BEW代表的是飞机使用空重。()
A.正确
B.错误
[判断题]英文缩写BEW代表的是飞机的干操作重量。()
A.正确
B.错误
[单选题]Procedures should be predetermined and followed shortage of water,bulging or fracture of plates or furnace.
A.in event of
B.in the event of
C.as the event of
D.for the event of
[单选题] When should operational check on navigation equipment be done?
A. Regulary, when preparing for sea and entering port
B. As often as possible
C. When errors are indicated
D. When time allows
[单选题] Should recommended route information be used together with weather routeing?
A. Yes
B. No
C. Sometimes
D. Only if recommended by weather routeing
[判断题]Treaties should be transmitted to the security Council of the United Nations for registration and publication after entry into force.
A.正确
B.错误
[单选题]Each cylinder should be scavenged before the charged air is compressed.
A.good
B.better
C.best
D.well
[单选题]Crankcase door or inspection door should not be openedthe engine has cooled down.
A.as
B.until
C.after
D.because
[单选题]The main generator should be connected to
A.the main switchboard
B.the emergency switch board
C.the section switch board
D.the distribution board
[单选题] Charts should be corrected by using information published in the ______.
A.Light List
B.American Practical Navigator
C.Notice to Mariners
D.Coast Pilot
[单选题] When should voyage planning be done?
A. During the sailing
B. Prior the sailing
C. After sailing
D. Before the pilot is leaving
[单选题] The Company should clearly define and document the master's responsibility with regard to all the following items except ______.
A.implementing the safety and environmental protection policy of the Company
B.preparing procedures to respond to emergency situations
C.verifying that specified requirements are observed
D.reviewing the SMS and reporting its deficiencies to the shore based management