题目详情
当前位置:首页 > 学历类考试 > 博士考试
题目详情:
发布时间:2023-10-09 11:45:14

[单项选择]The problem of where we will raise the funds for the scheme has not yet been ().
A. accessed
B. addressed
C. dealt
D. expressed

更多"The problem of where we will raise "的相关试题:

[单项选择]We’ll()some necessary measures to raise the working efficiency.
A. give
B. make
C. take
D. use
[单项选择]Don’t()this newa to the public until we give you the go-ahead.
A. release
B. relate
C. relieve
D. retain
[单项选择]

We should apply for annual spare parts according to()
Ⅰ.he need of annual overhaul
Ⅱ.he storage of spare parts
Ⅲ.he storage capacity of spare parts room


A. Ⅰ
B. Ⅱ
C. Ⅰ+Ⅱ
D. Ⅲ
[单项选择]They()so that we wouldn't recognize them.
A. disguise
B. disguised
C. were disguising
D. were disguised
[单项选择]When we arrived here yesterday, their ship ()for three days.
A. has left
B. had left
C. has been away
D. had been away
[单项选择]The () can tell us how much heat we can get from the burning of an oil.
A. viscosity
B. flash point
C. cetane number
D. calorific value
[单项选择]Don’t() this news to the public until we give you the go-ahead.
A. release
B. relate
C. relieve
D. retain
[单项选择]I have been()that we are to shift from the wharf to buoys No.12 and No.13.
A. noted
B. noticed
C. notificated
D. notified
[单项选择]How should you signal the crane operator to raise the boom?().
A. Extend arm with the thumb pointing up and flex the fingers in and out
B. Place both fists in front of the body with the thumbs pointing upward
C. With forearm vertical and forefinger pointing up,move hand in small horizond circles
D. Extend arm with the fingers closed and thumb upward
[单项选择]Increased air () will raise scavenge efficiency and allow a greater mass of air to be compressed; more fuel may now be burned giving an increased power.
A. specific volume
B. density
C. viscosity
D. calorific value
[单项选择]When we write, we must write as()as we can.
A. careful
B. carefully
C. more careful
D. more carefully
[单项选择]A tackle by which the outer end of a boom is raised and lowered is the topping().
A. Boom
B. Lift
C. Raise
D. Tackle
[单项选择]In a general cargo crane, () is fitted to raise or lower the jib.
A. the slewing motor
B. the luffing motor
C. the hoisting motor
D. none of the above
[单项选择]() unit is mounted so as to raise and lower the cable from the spurling pipe, which is at the top and center of the chain or cable locker.
A. The cable lifter
B. The hoisting motor
C. The topping wire
D. The life-raft
[单项选择]As we were driving along we saw a good restaurant, so we stopped()dinner.
A. having
B. to have
C. having been 
D. to be had
[单项选择]We are glad that we finally managed to get into contact()them.
A. at
B. on
C. from
D. with
[单项选择]()we have worked out the loading plan,we shall start doing more revision work.
A. For now
B. Ever since
C. Now that
D. By now

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码