更多"FMECA(Failure Mode,Effect and Criti"的相关试题:
[名词解释]边际效应 marginal effect
[单项选择]Burner ignition failure in an automatically fired auxiliary boiler would be caused by()
A. a burned out solenoid in the oil supply valve
B. high temperature excess air
C. incorrectly setting the hot-well dump valve
D. an incorrectly positioned burner snubber realy
[单项选择]Flame failure in an automatically fired auxiliary boiler can from a/an ()
A. incorrect electrode setting
B. incorrect nozzle position
C. clogged fuel nozzle
D. broken high tension lead
[简答题]CCC控制器面板上的辅助窗口内出现报警代码"MPU 1 failure""MPU 2 failure"或"MPU 3 failure"的含义?
[多项选择]检查HDD Controller Failure故障的方法()
A. 检查硬盘电源线与硬盘的连接
B. 检查硬盘数据信号线与多功能卡或硬盘的连接
C. 尝试从软盘或光盘引导系统后使用SYSC://命令重新传送DOS引导
D. 进入CMOS,检查并改正其中的错误参数
[单项选择]Ignition failure in an automatically controlled auxiliary boiler could be caused by()
A. carbon deposits on the flame scanner
B. high fuel oil temperature
C. low fuel oil viscosity
D. high steam pressure
[单项选择]His feelings to this failure have()from bitterness to hope.
A. scattered
B. ranged
C. implied
D. reflected
[单项选择]The present difficulties()from our failure to deal with the problem when it first arose.
A. step
B. stem
C. steer
D. sponsor
[名词解释]System management mode
[单项选择]The greatest detrimental effect on idle electrical equipment, such as cargo pump motors, is the().
A. loss of residual magnetism
B. absorption of moisture in the insulation
C. insulation varnish flaking
D. dirt collecting on the windings
[单项选择]Cargo contaminated due to failure to provide clean holds prior to loading is an example of().
A. lack of due diligence
B. restraint of princes
C. inherent vice
D. latent defect
[单项选择]Cancellation or failure to cancel shall be entirely without()to any claim for damages the Buyers may have under Clause 14 for the Vessel not being ready by the original canceling date.
A. damage
B. prejudice
C. loss
D. injury
[单项选择]Failure to comply with the above may()actoin being taken against the vessel.
A. resulted in
B. result in
C. resulting in
D. to result in
[单项选择]As there was a power failure in the hospital, the doctor had to ()operation.
A. call for
B. call off
C. call on
D. cal lout
[单项选择]During a storm,the chance of fatigue failure of a mooring line will increase as().
A. vessel motions increase
B. mooring tensions decrease
C. KG increases
D. KG decreases