题目详情
当前位置:首页 > 职业技能鉴定考试 > 轮机英语
题目详情:
发布时间:2023-10-15 15:06:04

[单项选择]Accidental grounds in a shipboard electrical system must be repaired as soon as possible as they will ()
A. result in immediate power outages
B. damage circuit breakers
C. appear on the ground detection system
D. damage insulation and may cause outages

更多"Accidental grounds in a shipboard e"的相关试题:

[单项选择]The part of the shipboard electrical system used to control the distribution of power to the branch circuits, is the ().
A. bridge control panel
B. disconnect links
C. governor relay box
D. main switchboard
[单项选择]Which shipboard equipment will detect a signal from a SART?()
A. S-Band Radar
B. A DSC receiver
C. X-Band Radar
D. The autoalarm
[单项选择]Shipboard Emergency Drills must be carried out at least()on board cargo ship.
A. Once every third year
B. Once a month
C. Once a year
D. Once a week
[单项选择]The approval period for a shipboard Oil Pollution Emergency Plan expires after().
A. two years
B. three years
C. four years
D. five years
[单项选择]Shipboard Oil Pollution Emergency Plans must be reviewed().
A. annually by the owner,with a letter submitted six months before expiration
B. only once every five years,with a letter submitted six months before expiration
C. and the entire plan resubmitted for approval once every five years,six months before expiration
D. annually by the owner,with a letter submitted to the Coast Guard within one month of the anniversary date of the plan approval
[单项选择]Coast Guard regulations require a shipboard Oil Pollution Emergency Plan to be reviewed().
A. annually
B. once every two years
C. once every four years
D. once every five years
[单项选择]The approval period for a shipboard oil pollution emergency plan expires after ().
A. one year
B. two years
C. four years
D. five years
[单项选择]A shipboard Oil Pollution Emergency Plan is required of().
A. all vessels,regardless of size and commercial application
B. any barge or ship constructed or operated in such a manner that no oil in any form can be carried aboard
C. an oil tanker of 150 gross tons and above,or other ship of 400 gross tons and above
D. an oil tanker of 400 gross tons and above,or other ships of 150 gross tons and above
[单项选择]The shipboard oil pollution emergency plan will be invalid after ()
A. one year
B. two years
C. four years
D. five years
[单项选择]Which statement comparing a shipboard crane to conventional gear is TRUE().
A. Cranes are more difficult to secure for sea
B. The spotting area of the conventional gear is larger
C. A crane operator requires more training than the winch operator of a yard and stay rig
D. The yard and stay rig is more flexible in its ability to handle a wider variety of cargoes
[单项选择]A shipboard oil pollution emergency plan is required of ().
A. all vessels, regardless of size and commercial application
B. any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboard
C. an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or above
D. an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above
[单项选择]When amendments are made to the Shipboard Oil Pollution Emergency Plan,the revisions must be submitted to the Coast Guard().
A. one month before the anniversary date of the plan
B. six months before the end of the approval period
C. and cannot be implemented without approval
D. and can be implemented without immediate approval as long as final approval is received within six months of submission
[单项选择]Which is a mandatory section of the shipboard Oil Pollution Emergency Plan().
A. Reporting requirements
B. Removal equipment list
C. Planned exercises
D. List of individuals required to respond
[单项选择]Which is NOT a mandatory part of the shipboard Oil Pollution Emergency Plan?()
A. Reporting requirements
B. Diagrams
C. Steps to control a discharge
D. National and local coordination
[单项选择]All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the().
A. date of the test
B. load at which a test sample broke
C. name of the vessel
D. number of strands and of wires in each strand
[单项选择]In a closed diesel engine freshwater cooling system, the amount of coolant flowing through the heat exchanger is controlled by the ().
A. suction pressure regulator
B. thermostatic bypass valve
C. sea water temperature
D. water level in the expansion tank
[单项选择]Water allowed to accumulate in the hydraulic system oil will cause an oxidation process producing by- products which are normally ().
A. gums, acids, and varnishes
B. removed by cellulose type filters
C. neutralized by oil additives
D. not removed by absorbent filters

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码