[单项选择]I’ve already put down the remarks DECK CARGO()SHIPPER’S RISK in the Shipping Order.
A. IN
B. ON
C. AT
D. FOR

更多"I’ve already put down the remarks D"的相关试题:

[单项选择]I’ve already put down the remarks deck cargo()shipper’s risk in the shipping order.
A. in
B. on
C. at
D. for
[单项选择]I saw the cargo surveyor()the cargo on deck just a minute ago.
A. examine
B. to examine
C. being examined
D. examining
[单项选择]Cargo on deck,plants and live animals are usually received,handled,carried,kept and discharged at().
A. Carrier’s risk
B. Owner’s risk
C. Merchant's risk
D. Charterer’s risk
[单项选择]The Captain ordered the dangerous cargo on deck()to lighten the ship and minimize the risk at sea.
A. be jettisoned
B. be dropped
C. be dived
D. be abandoned
[单项选择]The Safety Radio Certificate for the cargo Ship is issued().
A. by the Radiotelegraphy Authority of a country
B. in accordance with the Government Regulations
C. by Complying with the Provisions of the international Conventions
D. under the Provisions of the SOLAS Convention
[单项选择]The Safety Radio Certificate for the Cargo Ship is issued().
A. by the Radiotelegraphy Authority of a country
B. in accordance with the Government Regulations
C. by complying with the Provisions of the National Conventions
D. under the Provisions of the SOLAS Convention
[单项选择]The helicopter deck of a ship must be marked with the units identification,appropriate aiming circles,and a continuous line on the perimeter which is().
A. 8 inches wide
B. 16 inches wide
C. 24 inches wide
D. 32 inches wide
[单项选择]For a general cargo ship, is not the necessary certificate/document that the PSCO will examine()
A. Survey Report File
B. Minimum Safe Manning document
C. Certificates of Competency
D. International Oil Pollution Prevention
[单项选择]When cargo is shifted from the main deck into the lower hold of a vessel,().
A. The metacenter will move downward
B. The GM will increase
C. The center of buoyancy will move upward
D. The list of the vessel will become great
[单项选择]The deck plating on a ship is supported primarily by deck longitudinals and deck().
A. girders
B. stanchions
C. frames
D. beams
[单项选择]Stanchions prevent the entire deck load on a ship from being carried by the().
A. bulkheads
B. stringers
C. frames and beam brackets
D. deck longitudinals
[单项选择]If the Shipowner has agreed to receive deck cargo,()must contribute to the loss,provided the owner of the jettisoned goods is the sole cargo owner.
A. the ship
B. the ship and the freight
C. the freight
D. neither the ship nor the freight
[单项选择]Deck foam systems,designed to protect cargo areas on tankers built after January 1,1975,must have a supply of foam-producing material to operate the system at its designed rate of foam production for().
A. 15 minutes without recharging
B. 20 minutes without recharging
C. 25 minutes without recharging
D. 30 minutes without recharging
[单项选择]Deck beams on a ship are generally spaced at equal intervals and run().
A. longitudinally
B. vertically
C. transversely
D. intermittently
[单项选择]The deck loads on a ship are distributed through the deck beams to the().
A. frames
B. hull
C. stringers
D. plates
[单项选择]A large oil fire on the deck of a ship can be fought most effectively with().
A. dry chemical
B. foam
C. high-velocity fog
D. Water (cartridge-operated)

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码