[单项选择]The solid waste was charged into the incinerator through ().
A. the solid waste dump chute
B. an access door
C. the same way for waste oil burners
D. a changing opening

更多"The solid waste was charged into th"的相关试题:

[单项选择]Solid waste generation,and electricity and water consumption are costly and have their own set of environmental().
A. inspect
B. impairs
C. impacts
D. insects
[单项选择]During waste clothes being charged into an incinerator, the auxiliary burner().
A. should be stopped manually
B. keeps the combustion as usual
C. would be cut off by an interlock
D. would replace the waste oil burner and keep going on
[单项选择]Concerning the incinerator’s operation, which of the following is not correct?()
A. Scavenging time should be more 30 seconds before igniting
B. The temperature of sludge tank is 80~100℃
C. First igniting the incinerator with diesel oil, when the temperature of health is about 600℃, the sludge oil drawn in
D. The ash can be dumped into sea when the distance is more than 3 miles from land
[单项选择]

When does auxiliary burner of incinerator put into operation? ()
Ⅰ. start incinerator when it is cold
Ⅱ. the sludge for dealing with is little
Ⅲ. the sludge for dealing with is large
Ⅳ. the water and impurity in sludge are too much
Ⅴ. the temperature in incinerator is low
Ⅵ. dealing with little solid rubbish


A. Ⅰ+Ⅱ+Ⅲ+Ⅴ
B. Ⅰ+Ⅱ+Ⅲ+Ⅳ
C. Ⅰ+Ⅳ+Ⅴ+Ⅵ
D. Ⅰ+Ⅱ+Ⅲ+Ⅵ
[单项选择]When the incinerator is stopped, which of the following is wrong?()
A. After stopping supplying sludge oil, the value and pipe should be flushed by flushed by diesel oil and the incinerator continue burning for 10 minutes
B. Close auxiliary burner firstly and then close main burner
C. After stopping fuel, restoring the position of main fuel supply valve
D. Stop blower as soon as stopping supplying fuel oil
[单项选择]Waste oil should()
A. be treated according to the C-Es command exactly
B. be treated according to MARPOL
C. accumulate in bilges or on tank tops in accordance with MARPOL
D. discharge to sea at the specified areas
[单项选择]Vessels transiting Suez Canal are charged according to their().
A. gross tonnage
B. Suez Canal tonnage's
C. net tonnage's
D. Panama Canal tonnage's
[单项选择]Freight rates are mostly charged().
A. by the weight (tons) of cargo
B. by the capacity (tons) of vessel
C. by DW of the vessel
D. by the draft of the vessel
[单项选择]The purpose of designing some waste heat boilers with sinuous fire tubes, is to()
A. increase exhaust gas velocity through the boiler
B. reduce accumulations of carbon deposits on the heat transfer surfaces
C. eliminate exhaust gas pulsations and noise
D. increase the rate of heat transfer to the waterside
[单项选择]An exhaust gas bypass is installed on a waste heat boiler in order to ().
A. bypass exhaust gas at high loads to prevent excessive back pressure
B. bypass a portion of the exhaust gas at peak loads for better efficiency
C. recycle exhaust gas to the turbocharger
D. minimize moisture condensation in the boiler gas passages at low loads
[单项选择]The PRIMARY function of a waste heat boiler is to ()
A. reduce engine exhaust noise
B. reduce engine back pressure
C. recover heat which otherwise would be lost
D. increase turbocharger efficiency
[单项选择]On a turbo-charged, medium-speed diesel engine, which of the following problems is an indication of a restricted air intake passage?()
A. Engine is hard to start
B. Engine misses
C. Surges at governed RPM
D. Coolant temperature is too low
[单项选择]Storage batteries should be charged in a well ventilated area because().
A. they generate heat
B. they emit hydrogen
C. of the toxic fumes they emit
D. they recharge faster in a well ventilated space
[单项选择]You intend to discharge medical or hazardous wastes ashore MARPOL annex V requires you to notify a receiving port or terminal in advance.How much advance notice require?()
A. 12 hours
B. 24 hours
C. 48 hours
D. Advance notification is not required
[单项选择]Generating tubes in waste heat boilers are finned to ().
A. reduce gas flow turbulence
B. prevent exhaust gas corrosion
C. increase the rate of combustion
D. increase the rate of heat transfer
[单项选择]Diesel engine waste heat boiler construction is usually of the fire-tube or()
A. cyclone furnace boiler type
B. dry back boiler type
C. water-tube type
D. critical circulation boiler type

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码