题目详情
当前位置:首页 > 职业技能鉴定考试 > 航海英语
题目详情:
发布时间:2023-10-21 17:46:40

[单项选择]A liner in riveted construction of a vessel is a(n)().
A. small plate which fills the aperture between riveted strakes and the vessel framing
B. backing plate which is used to level the strakes while riveting,and then removed
C. internal frame to which the side shell is riveted
D. seam that is welded after riveting is completed

更多"A liner in riveted construction of "的相关试题:

[单项选择]A “liner” in riveted construction of a vessel is a(n)().
A. small plate which fills the aperture between riveted strakes and the vessel framing
B. backing plate which is used to level the strakes while riveting,and then removed
C. internal frame to which the side shell is riveted
D. seam that is welded after riveting is completed
[单项选择]The pivoting point of a fully loaded vessel with normal trim proceeding ahead at sea speed is().
A. right at the bow
B. one-third the length of the vessel from the bow
C. one-half the length of the vessel from the bow
D. two-thirds the length of the vessel from the bow
[单项选择]The use of liners in riveted construction is eliminated by using().
A. lapped construction
B. strapped construction
C. joggled construction
D. belted construction
[单项选择]In vessel construction. Beam brackets are triangular plates than join the deck beam to a().
A. bulkhead
B. frame
C. stanchion
D. deck longitudinal
[单项选择]In vessel construction, beam are transverse girders which provide support to().
A. bulkheads
B. deckhouse structures
C. decks
D. vertical frames
[单项选择]In vessel construction,beam brackets are triangular plates that join the deck beam to a().
A. bulkhead
B. frame
C. stanchion
D. deck longitudinal
[单项选择]In vessel construction, a greater number of watertight bulkheads results in().
A. increased capacity to set flooding boundaries
B. decreased capacity to set flooding boundaries
C. reduced compartmentation
D. greater deck load capacity
[单项选择]In vessel construction,a greater number of watertight bulkheads results in().
A. increased capacity to set flooding boundaries
B. decreased capacity to set flooding boundaries
C. reduced compartmentation
D. greater deck load capacity
[单项选择]In vessel construction,the garboard strake is().
A. located next to and parallel to the keel
B. located next to and parallel to the gunwale
C. another term for the bilge keel
D. another term for the rub rail
[单项选择]In vessel construction,beams are transverse girders which provide support to().
A. bulkheads
B. deckhouse structures
C. decks
D. vertical frames
[单项选择]Due to the nature of a vessel’s construction for a particular trade,it does not fully comply with the provisions of SOLAS. Where will this be indicated?().
A. On the Exemption Certificate
B. On the reverse of the particular SOLAS certificate affected
C. On the face of the Certificate of Inspection
D. Nowhere; the vessel must engage in international trade
[单项选择]The wind is ESE,and a sailing vessel is steering NW. Which fog signal should she sound?()
A. One blast at one-minute intervals
B. One blast at two-minute intervals
C. Two blasts at one-minute intervals
D. One prolonged and two short blasts at two-minute intervals
[单项选择]If a vessel of special construction cannot fully comply with the Rules,her degree of compliance shall be determined by().
A. IMO
B. The owners of the vessel
C. The government
D. The builder
[单项选择]A vessel using a traffic separation scheme shall normally join or leave a traffic lane at the ()of the lane.
A. ended
B. terminative
C. termination
D. side
[单项选择]A vessel continually lists to one side and has a normal rolling period. Which statement is true?().
A. The vessel has negative GM
B. The center of gravity is on the centerline
C. The list can be corrected by reducing KM
D. The vessel has asymmetrical weight distribution

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码