题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2024-03-17 03:39:26

[单项选择]During a NIM install, the system stops with the LED code 611.What is the cause of the issue?()
A. A failure to NFS mount filesystems from the NIM client
B. A failure to NFS mount filesystems from the NIM master
C. A failure to retrieve the tftp client info from the NIM master
D. A failure to retrieve the tftp server info from the NIM master

更多"During a NIM install, the system st"的相关试题:

[单项选择]During a NIM install,the system stops with the LED code 611.What is the cause of the issue?()
A. A failure to NFS mount filesystems from the NIM client
B. A failure to NFS mount filesystems from the NIM master
C. A failure to retrieve the tftp client info from the NIM master
D. A failure to retrieve the tftp server info from the NIM master
[单项选择]During a NIM install, the system stops with the LED code 611.  What is the cause of the issue()?  
A. A failure to NFS mount filesystems from the NIM client
B. A failure to NFS mount filesystems from the NIM master
C. A failure to retrieve the tftp client info from the NIM master
D. A failure to retrieve the tftp server info from the NIM master
[单项选择] You install a non-RAC Oracle Database. During Installation, the Oracle Universal Installer (OUI) prompts you to enter the path of the Inventory directory and also to specify an operating system group name. Which statement is true?()
A. The ORACLE_BASE base parameter is not set.
B. The installation is being performed by the root user.
C. The operating system group that is specified should have the root user as its member.
D. The operating system group that is specified must have permission to write to the inventory directory
[单项选择]NIM的中文全称是()
A. 网络接口模件
B. 网络接口
C. 接口模件
D. 接口
[单项选择] An administrator is configuring an LPAR for a NIM installation and is unsure if the 'Ping Test' option within SMS is a required configuration step. Which statement best describes the 'Ping Test' option?()
A. The 'Ping Test' is a recommended step to verify the IP information entered into the RIPL SMS panel.
B. The 'Ping Test' is a mandatory step required to commit the IP information entered into the RIPL SMS panel.
C. The 'Ping Test' is an optional step to verify network configuration entered into the RIPL SMS panel on older copper-based networks.
D. The 'Ping Test' is an optional step to verify network connectivity between client and server, where ICMP traffic is allowed on the connecting network.
[单项选择]Which of the following is an optional NIM resource for a diskless client?()
A. root
B. spot
C. home
D. paging
[单项选择]What are the minimal resources to perform a NIM BOS install?()
A. spot, lpp_source
B. mksysb, lpp_source
C. boot, bundle, nim_script
D. aix disks, spot, lpp_source
[单项选择]For NIM to install client machines located in a non-adjacent network, which routing must be defined?()
A. Boot/install servers will be required on each intermediate network.
B. When an install is initiated by the client, routing is only required from the LPAR back to the NIM master.
C. When an install is initiated by the NIM master, routing is only required from the NIM master to the client.
D. Appropriate network NIM resources need to be defined to the NIM master to allow routing in both directions.
[简答题]Neteare的NIM模块主要分为哪几类?
[单项选择]If a restore from a NIM mksysb install hung on C54, which debug output would be best to investigate the problem?()
A. export INST_DEBUG =yes
B. bosboot -aID -d /dev/ipldevic
C. nim - to check -a debug =yes
D. type 911 at -Welcome to BOS install- menu
[单项选择]下列描述中对NIM节点的正确描述是()。
A. 实现LCN与UCN之间的数据通讯
B. TPS的人机接口
C. 实现LCN与HIGHWAY只见的数据通讯
D. 实现LCN与其他LCN只见的数据通讯
[填空题]Honeywell DCS系统的LCN节点NIM的全称(中文)是()。
[单项选择]UCN上设备类型有NIM、PM、APM、HPM、LM和()
A. MCU
B. MU
C. AM
D. SM
[单项选择]English consonants can be classified into stops, fricatives, nasals, etc. in terms of ______.
A. manner of articulation
B. openness of mouth
C. place of articulation
D. voicing
[单项选择]Que représente le Concorde sur le plan économique
A. une réussite
B. une erreur
C. un échec total
D. une victoire
[单项选择]She likes hearing her own voice. She never stops
A. talking
B. telling
C. to talk
D. to tell
[单项选择]For NIM to install client machines located in a non-adjacent network, which routing must be defined?()  
A. Boot/install servers will be required on each intermediate network.
B. When an install is initiated by the client, routing is only required from the LPAR back to the NIM master.
C. When an install is initiated by the NIM master, routing is only required from the NIM master to the client.
D. Appropriate network NIM resources need to be defined to the NIM master to allow routing in both directions.
[单项选择]She likes heating her own voice. She never stops ________
A. talking
B. telling
C. to talk
D. to tell
[单项选择]He is the kind of person who stops at nothing in order to ______ his own purpose.
A. promote
B. obtain
C. reach
D. achieve

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码