题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2023-09-29 06:49:21

[单项选择]During which phase of the boot process is the rootvg volume group varied on and the root file system (hd4) checked?()
A. Boot phase 1
B. Boot phase 2
C. Boot phase 3
D. Boot phase 4

更多"During which phase of the boot proc"的相关试题:

[单项选择]During the boot process, which of the following files should be sued to control system initialization and start daemons and subsystems?()
A. /etc/inittab
B. /etc/rc.boot
C. /etc/services
D. /etc/environment
[单项选择]Which phase of the software development requires the most development time
A. the design phase
B. the testing phase
C. the maintenance phase
D. the development phase
[单项选择]In Which phase of the software engineering process iS the Software Requirements Specification developed
A. definition phase
B. engineering phase
C. maintenance phase
D. development phase
[单项选择]During which phase is a proposal developed and delivered?()
A. Prepare
B. Plan
C. Design
D. Operate
[单项选择]Which process occurs first during the Ethernet Discovery Stage process for a PPPoE service offering?()
A. The ERX router sends an Active Discovery Off ermessage.
B. The ERX router sendsan Active Discovery Initiation message.
C. The customer device sends an Active Discovery Offer message.
D. The customer device sends an Active Discovery Initiation message.
[单项选择]In which phase is a systems acceptance test plan developed and documented? ()
A. Implement
B. Design
C. Prepare
D. Operate
[单项选择]In which phase of the project life cycle,are cost and staffing levels high ?()
A. Intermediate stag
B. Final stag
C. Pre-intermediate stag
D. Initial stag
[单项选择]It is a process during ______ the body releases water to cool the skin.
A. when
B. which
C. where
D. that
[单项选择]During which boot phase is the rootvg first activated()
A. Phase 1
B. Phase 2
C. Phase 3
D. POST Phase
[单项选择]In which project phase do you have the GREATEST influence on project risk
A. Conceptua
B. Desig
C. Executio
D. Implementatio
[单项选择]In which service component of the optimize phase would you assess the routing and switchingsystem and recommend activities such as optimizing device configurations, capacity planning, ortraffic analysis? ()
A. Change Management
B. Security Assessment
C. Operations Assessment
D. Security Administration
E. Operations Readiness Assessment
F. Technology Assessment
[单项选择]Which president did nothing with the root of Vietnam War
A. Truman.
B. Kennedy.
C. Eisen Hower.
D. Nixon.
[单项选择]Which reference code is displayed during the boot process that signals that an administrator may interrupt the boot process to enter the SMS Menu?()
A. 517
B. B0G1
C. E1F1
D. 00A8
[单项选择]Which of the following commands will repair boot sector blocks after a virus has been removed?()
A. chkdsk
B. format
C. fixmbr
D. sfc
[单项选择]During the project scope planning process, the work breakdown structure should be developed to ______ .
A. the sub-project level
B. the level determined by the project office
C. a level allowing for adequate estimates
D. the cost center level

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码