更多"During which of the following phase"的相关试题:
[单项选择]Which of the following printers includes an imaging drum and fuser assembly?()
A. Laser
B. Impact
C. Inkjet
D. Thermal
[单项选择]Which of the following phases does not belong to the disaster predication process
[单项选择]Which of the following occurs during POST?()
A. OS loads
B. Safe Mode starts
C. RAM check
D. MBR check
[单项选择]Given the following LSP configuration, which statement is true?()label-switched-path lsp-xyz { to 10.200.1.1; primary path1; secondary path2; secondary path3; no-cspf; } path path1 { 10.200.10.1 strict; } path path2 { 10.200.20.1 strict; } path path3 { 10.200.30.1 loose; }
A. The router will use path1 when it is available and stable.
B. The router will use path3 when it is available and stable.
C. The router will attempt to establish path2 only when path1 and path3 are down.
D. The router will attempt to establish path1 only when path2 and path3 are down.
[单项选择]During an AIX installation, which of the following actions will occur once the Complete Overwrite option is selected?()
A. All new disks in the system will be formatted
B. Only the contents of the root volume group destination disks will be destroyed
C. All file systems, including /(root), /tmp, /usr, and /var, but no usr data in the root volume group, will be destroyed
D. The contents of all disks on the system, even if they are not shown as the destination root volume group disks, will be destroyed
[单项选择]About the following IP address ,Which is incorrect
A. 202.115.258.11
B. 127.0.0.1
C. 202.115.199.199
D. 203.115.26.0
[单项选择]About the following IP addresses, Which is incorrect ( )
A. 201.199.255.11
B. 201.198.132.1
C. 201.199.128.6
D. 201.198.134.257
[单项选择]During the boot process, which of the following files should be sued to control system initialization and start daemons and subsystems?()
A. /etc/inittab
B. /etc/rc.boot
C. /etc/services
D. /etc/environment
[单项选择]All of the following occurred during the planning process group EXCEPT ______ .
A. develop project charter
B. create WBS
C. estimate costs
D. sequence activities
[单项选择] You perform the following activities during the database upgrade from Oracle Database 10g to Oracle Database 11g: 1. Capture plans for a SQL workload into a SQL Tuning Set (STS) before upgrade. 2. Load these plans from the STS into the SQL plan baseline immediately after the upgrade. What is the reason for performing these activities? ()
A. to minimize plan regression due to the use of a new optimizer version
B. to completely avoid the use of new plans generated by a new optimizer version
C. to prevent plan capturing when the SQL statement is executed after the database upgrade
D. to keep the plan in the plan history so that it can be used when the older version of the optimizer is used
[单项选择]Which of the following is one way in which Nevelson's art illustrates her theory as it is expressed in paragraph 4
A. She sculpts in wood rather than in metal or stone.
B. She paints her sculptures and frames them in boxes.
C. She makes no preliminary sketches but rather allows the sculpture to develop as she works.
D. She puts together pieces of ordinary objects once used for different purposes to make her sculptures.
[单项选择]Given the following possibilities, which one results in an increase in total consumer expenditures()
A. demand is unitary elastic and price falls.
B. demand is elastic and price rises.
C. demand is inelastic and price rises.
[单项选择]Of the following estimates, which most accurately reflect the actual cost of the project ?()
A. Conceptual estimate
B. Order of magnitude estimate
C. Preliminary estimate
D. Bottom-up estimat
[单项选择]Which of these correctly identifies the six phases of the Cisco Lifecycle Services framework? ()
A. Prepare, Plan, Create, Implement, Operate, and Improve
B. Prepare, Plan, Design, Implement, Operate, and Optimize
C. Prepare, Plan, Design, Apply, Operate, and Manage
D. Prepare, Plan, Design, Implement, Operate and Manage
[单项选择]Of the following functions, which is NOT possessed by the navigation computer
[单项选择]Refer to the following architectures, which one is able to supply a core infrastructure so that customers can capitalize quickly with the change of business requirements?()
A. Branch
B. Campus
C. Teleworker
D. Data center
[单项选择]Which of the following is NOT the reason for which Bank of America thrived
[多项选择]Which three are the phases of the Cisco Smart Business Roadmap?()
A. Finished
B. Implemented
C. Foundation
D. Beginning
E. Optimized
F. Growth