更多"[单选题]When will triple indicator ind"的相关试题:
[单选题]When park brake is on, the two engine EPR value shall not above:
A.1.32
B.1.19
C.1.05
[单选题]When will cabin pre-pressurization start?
A. When engine starts
B. application of TO power
C. liftoff
[单选题]When both engines are stopped, how do you pressurize green system?
A. Use green engine pump
B. Use yellow engine pump and power transfer unit
C. Use yellow electric pump and power transfer unit
[单选题]If anti-skid brake fails, the maximum brake pressure should be ____PSI.
A.3000
B.2000
C.1000
[单选题]Maximum brake temperature for takeoff is:
A. 650℃
B. 450℃
C. 300℃
[单选题]The backup brake check should first:
A. park brake ON
B. check CHOCK in place
C. Y ELEC PUMP ON
[单选题]which of the following is the speed brake
A. spoiler1 3 5
B. spoiler 1 2 3
C. spoiler 2 3 4
[单选题]To check the validity of back up brake system, pedals of both sides should be pressed at same time, and the pressure must be ____.
A. 1000---1500PSI
B. 1500---2000PSI
C. 2000---2700PSI
[单选题]In ILS approach, what does aural triple click mean?
A. Level 3 warning to flight crew
B. Slats setting 3 and landing gear is not put down
C. Degrading warning of landing capability
[单选题]Use of ____ mode brake is not recommended at landing.
A. MAX
B. MED
C. LO
[单选题]The Wing Tip Brake (WTB) C/Bs have ___ caps on them to prevent them from being reset.
A. Red
B. Green
C. Black
[单选题]A/SKID&N/W STRG switch is OFF,brake application is supplied by ( ) system
A. green
B. blue
C. yellow
[单选题]When happens when CAPT3 is selected?
A. Pilot uses the observer’s audio equipments
B. Observer uses pilot’s audio equipments
C. Pilot uses third occupant’s ACP
[填空题]pre-series production
[多选题]多选题:一号线既有电客车EP2002 Brake Consultant功能有( )。
A.对CAN网络中EP2002阀自检
B.上传更新制动软件
C.更改车轮尺寸
D.重置设备里程表计数器
[单选题]When RAM AIR is at ON position, when use automatic control operation and differential pressure is lower than 1 psi, the outflow valve is to
A.100%
B.80%
C.50%
[单选题]【单选】下降准备时,由______检查着陆性能,并将自动刹车(AUTO BRAKE) 选择电门置于所需的刹车设置?
A.PF
B.PM