更多"Quality control involves monitoring"的相关试题:
[单项选择]Performing (74)involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.
A. quality planning
B. quality assurance
C. quality performance
D. quality control
[单项选择]英译汉:“quality management;quality control;quality certification mark”,正确的翻译为()
A. 质量管理;质量控制;质量标志
B. 质量标志;质量控制;质量管理
C. 质量标志;质量管理;质量控制
D. 质量控制;质量管理;质量标志
[单项选择]英译汉:“quality certification mark;quality control;quality management”,正确的翻译为( )。
A. 质量管理;质量标志;质量控制
B. 质量标志;质量控制;质量管理
C. 质量标志;质量管理;质量控制
D. 质量控制;质量管理;质量标志
[单项选择]Tools and techniques of quality control include all of the following EXCEPT:
A. Flowchartin
B. Pareto char
C. Control chart
D. Estimates of control tendenc
[单项选择]Inputs to quality control include all of the following EXCEPT ______ .
A. work performance information
B. quality management plan
C. quality checklists
D. PERT chart
[单项选择]A new system of quality control was brought in to overcome the defects in the firm's products.
A. invested
B. introduced
C. installed
D. insisted
[单项选择]A new system of quality control was _____ to improve the firm’s products.
A. invested
B. published
C. introduced
D. displayed
[单项选择]A new system of quality control was {{U}}brought in{{/U}} to overcome the defects in the firm's products.
A. invested
B. introduced
C. installed
D. insisted
[单项选择]A new system of quality control was ______ to overcome the shortcomings in the firm's products.
A. invested
B. informed
C. introduced
D. instructed
[单项选择]A new system of quality control was {{U}}brought{{/U}} in to overcome the defects in the firm's products.
A. invested
B. introduced
C. installed
D. insisted
[单项选择]A new system of quality control was __________ to overcome the defects in the firm's products.
A. invested
B. installed
C. introduced
D. instructed
[单项选择]To control (quality) and (making) decisions (about) production are among the many responsibilities of an (industrial) engineer.
A. quality
B. making
C. about
D. industrial
[单项选择]To control (quality), and (making) decisions (about) production are among the many responsibilities of an (industrial) engineer.
A. quality
B. making
C. about
D. industrial
[单项选择]A project team includes five people,then the project manager adds two more.How many additional channels of communication are there
A. 7.
B. 10.
C. 21.
D. 11.