题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2023-10-23 10:27:33

[单项选择]To control (quality), and (making) decisions (about) production are among the many responsibilities of an (industrial) engineer.
A. quality
B. making
C. about
D. industrial

更多"To control (quality), and (making) "的相关试题:

[单项选择]To control (quality) and (making) decisions (about) production are among the many responsibilities of an (industrial) engineer.
A. quality
B. making
C. about
D. industrial
[单项选择]英译汉:“quality management;quality control;quality certification mark”,正确的翻译为()
A. 质量管理;质量控制;质量标志
B. 质量标志;质量控制;质量管理
C. 质量标志;质量管理;质量控制
D. 质量控制;质量管理;质量标志
[单项选择]People may spend time in making decisions about______.
A. which shoe to put on first
B. how to have breakfast
C. what clothes to wear to class
D. how to prepare to go to school
[单项选择]Quality control involves monitoring specific project results to determine if they comply with relevant quality standards. To evaluate quality control outputs, the project team should definitely have a working knowledge of ______ .
A. prevention and inspection
B. sampling and probability
C. special causes and random causes
D. tolerances and control limits
[单项选择]英译汉:“quality certification mark;quality control;quality management”,正确的翻译为( )。
A. 质量管理;质量标志;质量控制
B. 质量标志;质量控制;质量管理
C. 质量标志;质量管理;质量控制
D. 质量控制;质量管理;质量标志
[单项选择]Tools and techniques of quality control include all of the following EXCEPT:
A. Flowchartin
B. Pareto char
C. Control chart
D. Estimates of control tendenc
[单项选择]Inputs to quality control include all of the following EXCEPT ______ .
A. work performance information
B. quality management plan
C. quality checklists
D. PERT chart
[单项选择]A new system of quality control was brought in to overcome the defects in the firm's products.
A. invested
B. introduced
C. installed
D. insisted
[单项选择]A new system of quality control was _____ to improve the firm’s products.
A. invested
B. published
C. introduced
D. displayed
[单项选择]A new system of quality control was {{U}}brought in{{/U}} to overcome the defects in the firm's products.
A. invested
B. introduced
C. installed
D. insisted
[单项选择]A new system of quality control was ______ to overcome the shortcomings in the firm's products.
A. invested
B. informed
C. introduced
D. instructed
[单项选择]A new system of quality control was {{U}}brought{{/U}} in to overcome the defects in the firm's products.
A. invested
B. introduced
C. installed
D. insisted

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码