[单项选择]An example of scope verification is ______ .
A. review the performance of an installed software module
B. managing changes to the project schedule
C. decomposing the WBS to a work package level
D. performing a benefit/cost analysis to determine if we should proceed with the project

更多"An example of scope verification is"的相关试题:

[单项选择]Which of the following allows verification of the port that a printer is currently using?()
A. The print queue window from system tray
B. Properties of the printer from the Printers Control Panel
C. Print spooler view in the Printers Control Panel
D. Properties of the port within Device Manager
[单项选择] A verification plan shows a network diagram with branch office Routers B1 through B100, plus two ABRs, ABR1, and ABR2, all in area 100. The branches connect to the ABRs using Frame Relay point - to - point subinterfaces. The verification plan lists the output of the show i p ospf database summary 10.100.0.0 command on a router B1, one of the branches. Which of the following is true regarding the output that could be listed for this command?()
A. The output lists nothing unless 10.100.0.0 has been configured as a summary rou te using the area range command.
B. If 10.100.0.0 is a subnet in area 0, the output lists one Type 3 LSA, specifically the LSA with the lower metric when comparing ABR1's and ABR2's LSA for 10.100.0.0.
C. If 10.100.0.0 is a subnet in area 0, the output lists two Type 3 LSAs, one each created by BR1 and ABR2.
D. None, because the Type 3 LSAs would exist only in the ABR's LSDBs.
[单项选择]You are developing a verification plan for an upcoming OSPF implementation. Part of this plan is to verify the status of type 3 LSAs within the network. Which routers should you verify first to ensure that the configuration s are correct for generating type 3 LSAs?()
A. Internal routers within the backbone area (area 0)
B. Internal routers within the NSSAs
C. Internal routers within the stubby areas
D. ASBRs
E. ABRs
F. DRs and BDRs
[单项选择]EXAMPLE是( )
A. 过程名
B. 关键字
C. 数据集名
D. 文件名
E. 变量名
[单项选择]Completion of project scope activities is not measured against the ______ .
A. scope statement
B. requirements
C. WBS dictionary
D. WBS
[单项选择]While expanding the scope of bills eligible for discount, the ceiling on discount interest rate will be, gradually increased in support of the market - based interest rate reform.
[单项选择]During a project the scope of a product purchased on a cost reimbursable contract has increased.In the contract the fee to cover the contractor's indirect costs and allow a profit is calculated as 20% of the direct costs.What is most likely to be true ?()
A. The contractor's indirect costs will increase and the customer's payment for them will increase,to
B. The contractor's indirect costs will increase but the eLlstomer's payment for them will not increas
C. Neither the contractor's indirect costs nor the customer's payment for them will increas
D. The contractor's indirect costs will not increase but the customer's payment for them will increas
[单项选择]According to covering scope, which three classes can computer network be divided A) PSN, LAN, WANB) MAN, LAN, WAN C) PSN, FAST Ethernet, LAN D) PSN, FAST Ethernet, MAN
A. Receive Ready
B. Receive not Ready
C. Reject
D. Selective Reject
[单项选择]Inputs used during scope planning include all of the following EXCEPT ______ .
A. constraints
B. project charter
C. budget/cost analysis
D. product description
[单项选择]During the project scope planning process, the work breakdown structure should be developed to ______ .
A. the sub-project level
B. the level determined by the project office
C. a level allowing for adequate estimates
D. the cost center level
[单项选择]Verify scope ______ .
A. is the process of obtaining the stakeholders formal acceptance of the completed project scope and associated deliverables
B. refers to the final project report describing the project at completion
C. is not necessary if the project completes on time and on budget
D. OCCURS only when revisions of change orders are made to the project
[单项选择]The purpose of the scope statement includes all but which of the following:
A. Provides a basis for future project decision
B. Establishes a contract between the project team and the custome
C. Sets criteria to use to determine if a project or phase have been completed successfull
D. Establishes project constraints and assumption
[单项选择]Scope change control MUST be integrated with all of the following control processes EXCEPT ______ .
A. schedule
B. cost
C. procurement
D. quality
[单项选择]In scope and difficulty, the canals construction was most closely alike to that of the ______. ( )
A. Suez Canal
B. trans-Siberian Railroad
C. Taj Mahal
D. pyramids of Egypt
[单项选择]What is implied about the scope of business of Qantas
A. Fashion design.
B. Dealing with stocks
C. Airlines
D. Shipping
[单项选择]The scope of freight forwarder's service on behalf of consignee(CIF)includes( ).
A. packing the goods
B. paying the freight to the marine carrier
C. arranging import customs clearance
D. booking space with the marine carrier

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码