[单项选择]The creation of a work breakdown structure (WBS) is the process of ( )the major project deliverables.
A. subdividing
B. assessing
C. planning
D. integrating
[单项选择]The work breakdown structure is an excellent tool for objective control and evaluation. Which of the following is generally not validated through the WBS
A. Time, schedule, and cos
B. Management coordination and organizational structurin
C. Risk and impact of decision—makin
D. Quality of the wor
[单项选择]( )(Project Dragram,或称WBS Work Breakdown Structure)是一个组织工具,它通过树状图的方式对一个项目的结构进行逐层分解,以反映组成该项目的所有工作任务。
A. 组织结构图
B. 项目结构图
C. 工作任务分工表
D. 工作流程图
[单项选择]The WBS,estimates for each work package,and the network diagram are completed.Which of the following would be the NEXT thing for the project manager to do ?()
A. Sequence the activitie
B. Verify that they have the correct scop
C. Create a preliminary schedule and get the team's approva
D. Complete risk managemen
[单项选择]A work authorization system can be used to ().
A. manage who does each activity
B. manage what time and in what sequence work is done
C. manage when each activity is done
D. manage who does each activity and when it is done
[单项选择]What is the WBS typically used for
A. To organize and define the total scope of the projec
B. To identify the logical person to be project sponso
C. To define the level of reporting the seller provides the buye
D. As a record of when work elements are assigned to individual
[单项选择]Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the (75) level.
A. independent resource
B. individual work load
C. work milestone
D. work package
[单项选择]创建WBS的输入包括()。
A. 项目管理计划
B. 成本估算
C. WBS模板
D. 项目范围管理计划
[单项选择]WBS的三个基本要素是()
A. 层次结构、编码、工作包
B. 层次结构、编码、报告
C. 编码、报告、工作包
D. 层次结构、报告、工作包
[单项选择]Which of the following is true about the WBS:
A. The WBS is another term for the Gantt char
B. Each descending level of the WBS represents an increasingly detailed definition of the project wor
C. Work not in the WBS is usually defined in the scope statement of the projec
D. The WBS shows only the critical path activitie
[单项选择] You work as a system administrator at Certkiller.com. You are in the process of creating anASP.NET application using Microsoft .NET Framework v3.5. You receive an instruction from management to create a custom-templated server control. Toensure productivity you need to make sure that the child controls of the newly created servercontrol are identified within the hierarchy of the page. You thus need to identify the interface thatwill accomplish this. What should you do?()
A. You should consider implementing the IRequiresSessionState interface.
B. You should consider implementing the ITemplatable interface.
C. You should consider implementing the IPostBackDataHandler interface.
D. You should consider implementing the INamingContainer interface
[单项选择](39)不属于制定WBS 过程的功能。
A. 为提高项目成本、活动历时估算和资源估算的准确度建立基础
B. 定义绩效考核和控制的基准
C. 形成清晰的职责任命
D. 建立项目经理和项目干系人之间的沟通网络
[单项选择]()不是WBS的正确分解方法或结构。
A. 把主要的项目可交付物和子项目作为第一层
B. 在同一WBS层上采用不同的分解方法
C. 在不同WBS层上可采用不同的分解方法
D. 把项目生命期作为第一层,项目交付物作为第二层
[单项选择]下面关于 WBS的描述,错误的是( )。
A. WBS是管理项目范围的基础,详细描述了项目所要完成的工作
B. WBS最底层的工作单元称为功能模块
C. 树型结构图 WBS层次清晰、直观、结构性强
D. 比较大的、复杂的项目一般采用列表形式的 WBS表示
[单项选择]______不属于制订WBS过程的功能。
A. 为提高项目成本、活动历时估算和资源估算的准确度建立的基础
B. 定义绩效考核和控制的基准
C. 形成清晰的职责任命
D. 建立项目经理和项目干系人之间的沟通网络