题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2024-05-24 04:29:41

[单项选择]All of the following are the characteristics of the inquiries mentioned in the second paragraph except ______.
A. a large number of questionnaires were sent out
B. quantity rather than quality was emphasized
C. almost no effort was made to interview people from every walk of life
D. every publication in America got involved

更多"All of the following are the charac"的相关试题:

[单项选择]According to the passage, all the following are the description of today's Frenchmen EXCEPT that ______.
A. many of them prefer the modem lifestyle
B. they actually enjoy working at the assembly line
C. they are more concerned with money than before
D. they are more competitive than the old generation
[单项选择]The panel agreed on all of the following except that ______.
A. the ban on federal funds for human cloning should be made a law
B. the cloning of human DNA is not to be put under more control
C. it is criminal to use private funding for human cloning
D. it would be against ethical values to clone a human being
[单项选择]All the following characteristics of weather maps are mentioned in this passage EXCEPT ______.
A. barometric pressure
B. fronts
C. thermal changes
D. wind speed
[单项选择]All of the following are characteristics of parametric estimating EXCEPT______.
A. Historical information
B. Quantifiable
C. Scalable
D. Activity lists
[单项选择]All of the following are characteristics of project management process groups EXCEPT:
[单项选择]All the following are the characteristics of hypertext fiction EXCEPT that
A. it is written in a nonlinear fashion.
B. it does not always have a conclusion.
C. it must be read on a computer.
D. it gives readers a fragmented story.
[单项选择]All of the following are characteristics of the project management information system(PMIS)EXCEPT:
A. It is a standardized set of automated tools available within the organization and integrated into a syste
B. It is used by the project management team to support generation of the project management plan, facilitate feedback as the document is developed, control changes to the project management plan, and release the approved documen
C. It is used by the project management team to monitor and control the execution of activities that are planned and scheduled in the project, management pla The PMIS is also used to create new forecasts as neede
D. It is used by the project management team primarily to generate presentations to key stakeholder Typically, a separate, manual system is used for the integrated change control process, to facilitate feedback and control changes across the projec
[单项选择]All of the following are characteristics of a work package EXCEPT:
A. It is a deliverable or project work component at the lowest level of each branch of the work breakdown structur
B. It is a summary task at the top level of the WB
C. It includes the schedule activities required for completion of the deliverable or project work componen
D. It includes the schedule milestones required for completion of the deliverable or project work componen
[单项选择]Which of the following options will show all of the fixes installed on a system?()
A. lslpp -L
B. smitty verify_install
C. installp -a -V
D. smit install_latest
[单项选择]The author implies which of the following about the forces at work during the settlement of the Great Plains
[单项选择]All of the following statements are true EXCEPT that______ .
[单项选择]All of the following statements are true except that______.
A. newly married couple may beautify their house for themselves
B. women seldom repair things by themselves according to this passage
C. only old men can fix their own record-players
D. both men and women have a false belief that men can repair a lot of things
[单项选择]All of the following represent, or result from, the primary benefit of meeting quality requirements EXCEPT ______ .
A. less rework
B. higher productivity
C. lower costs
D. fewer change orders
[单项选择]Which of the following technologies facilitates the conversion of internal private IP addressing toexternal public IP addressing?()
A. DHCP
B. TCP/IP
C. NAT
D. SNMP
[单项选择]Mike Clarke did all the following EXCEPT ______ that night.
A. had some physical contact with the stranger
B. frightened an elderly lady
C. made a call to police
D. asked the stranger about his identity
[单项选择]Which of the following characteristics about swaps is least accurate Swaps:( )
A. are custom instruments and involve counterparty risk. 
B. are highly regulated. 
C. have no active secondary market.
[单项选择]Which of the following characteristics would create the least difficulty in estimating a bond's cash flows()
A. Variable coupon rate.
B. Put-able bond.
C. Non-callable bond.
[单项选择]A project has the following characteristics: payback of $2,000, profit of $1,000, project cost of $800, life cycle cost of $1,200. What is the benefit cost ratio of the project
A. 2.50.
B. 1.25.
C. 1.67.
D. 0.83.

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码