[单项选择]This difficult problem we face in the project has to be tackled before we can ______ to others.
A. pursue
B. advocate
C. precede
D. proceed

更多"This difficult problem we face in t"的相关试题:

[单项选择]First of all, this difficult problem has to be tackled, thus ______ us to proceed to the others.
A. to enable
B. enabled
C. enabling
D. having enabled
[单项选择]The most difficult problem we faced with is to reduce China's population to less than 1 billion within 20 years.
A. 现在摆在我们面前最艰巨的问题就是在20年里把中国人口降低到10亿。
B. 我们所面临的最艰难的问题是在20年里使中国的人口减少10亿。
C. 我们所面临的最艰难的问题是在20年里把中国人口降低到10亿以下。
D. 最艰巨的问题摆在我们面前就是在20年里把中国人口减少10亿。
[单项选择]To solve such a difficult problem is really ______ my grasp.
A. beyond
B. out of
C. beneath
D. away from
[单项选择]It's really a difficult problem to ______.
A. look at
B. make out
C. deal with
D. dwell on
[单项选择]The project sponsor has just provided the project charter.What is the NEXT thing to do ?()
A. Begin to complete work package
B. Complete scope verificatio
C. Start integrated change contro
D. Start to create management plan
[单项选择]It is______a difficult problem______nobodY can solve it.
A. such, that
B. so, that
C. so, as
D. such, as
[单项选择]The project team has added some additional functionality which was not required as part of the project. However the customer is satisfied with the project. From a quality perspective, ______ .
A. this is high quality because it exceeded customer expectations
B. this is not acceptable quality because gold plating was done which is not advisable
C. this will mean repeat business from the same customer
D. none of the above
[单项选择]The project team has just completed the initial project schedule and budget.The NEXT thing to do is ().
A. begin risk identification
B. begin iterations
C. determine communications requirements
D. create a bar(Gantchart
[单项选择]The project manager has just received a change from the customer that does not affect the project schedule and is easy to complete.What should the project manager do FIRST ?()
A. Make the change happen as soon as possibl
B. Contact the project sponsor for permissio
C. Go to the change control boar
D. Evaluate the other components of the“triple constraint”.
[单项选择]The project manager has the lowest level of authority in a ______ organization.
A. functional
B. weak matrix
C. strong matrix
D. projectized
[单项选择]The project manager has the highest level of independence and authority in an organization ______ .
A. strong matrix
B. weak matrix
C. projectized
D. functional
[单项选择]The project budget has been finalized.Additional work has been discovered that was not planned for in the budget or project scope.Where could the found to cover the newly discovered work item
A. Contingency reserv
B. Project profi
C. Management reserv
D. Abandoning fun
[单项选择]A project manager has to resolve two problems. However, both problems can occur in a single trial. In this situation, what is the BEST action the project manager can take
A. Develop a solution for each proble
B. Develop a solution that solves both problem
C. Use a statistically independent tria
D. N0 solution is needed, the two problems cancel each other ou
[单项选择]A project manager has just been assigned to a new project and has been given the project charter.The FIRST thing the project manager must do is ().
A. create a project scope statement
B. confirm that all the stakeholders have had input into the scope
C. analyze project risk
D. begin work on a project management plan
[单项选择]This is so difficult a problem that the scientist is known to ______ on it for about ten years, but hasn't found an answer yet.
A. have worked
B. have been working
C. be working
D. work on
[单项选择]When we saw his face, we knew ______ was bad.

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码