题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2023-10-16 04:57:17

[填空题]With the development of clever software, computing has been brought into ______.


更多"With the development of clever soft"的相关试题:

[填空题]With the development of clever software, computing has been brought into ______.
[单项选择]You are in the development phase of a software project and meeting the development team to collect the status.You want to show the team members the actual dependencies of different tasks.Which scheduling tool you will be using to explain them ?()(choose the best answer)
A. Milestone char
B. Flow char
C. Network diagra
D. Gantt char
[单项选择]You are working on a software development project and there is 60% probability that development will be completed by the planned date and 70% probability that testing will be completed by the planned date.What is the probability that development and testing will be completed as per schedule ?()
A. 65%.
B. 42%.
C. 66%.
D. 63%.
[单项选择]The software development project is not going well. There are over 30 stakeholders, and no one can agree on the project objectives. One stakeholder believes the project can achieve a 30 percent improvement while another believes a 50 percent improvement is possible. The project manager thinks a 10 percent improvement is more realistic. What is the BEST course of action ?()
A. Move forward with the project and look for more information later to settle the issue.
B. Average the numbers and use that as an objective.
C. Perform a feasibility analysis.
D. Ask the sponsor to make the final decision.
[单项选择]

As an important phase in software development, software design is the continuation of software requirement analysis phase.
Ⅰ.software structure  
Ⅱ.software procedure
Ⅲ.software module   
Ⅳ.software document
which of the following should be included in software design phase ?()


A. Ⅰand Ⅱ
B. Ⅱand Ⅲ
C. Ⅰ,Ⅱ and Ⅲ
D. All
[单项选择]The process of software development doesn't include()。
A. verification function
B. writing code
C. management function
D. validation function
[单项选择]In your software development project you have to wait for 5 days after ordering a new software and then only you can start integration testing. The 5 days in this case is an example of ().
A. lead
B. lag
C. delay
D. float
[单项选择]

基于软件架构的设计(Architecture Based Software Development,ABSD)强调由商业、质量和功能需求的组合驱动软件架构设计。它强调采用 (46) 来描述软件架构,采用 (47) 来描述需求。

(46)处填()。
A. 类图和序列图
B. 视角与视图
C. 构件和类图
D. 构件与功能
[单项选择]基于软件架构的设计(Achitecture Based Software Development,ABSD)强调由商业、质量和功能需求的组合驱动软件架构设计。它强调采用 (11) 来描述软件架构,采用 (12) 来描述需求。

A. 类图和序列图
B. 视角与视图
C. 构件和类图
D. 构件与功能
[简答题]基于构件的软件开发(Component-Based Software Development,CBSD)是一种基于分布对象技术,强调通过可复用构件设计与构造软件系统的软件复用途径。基于构件的软件系统中的构件可以是COTS(Commercial-Off-The-Shelf)构件,也可以是通过其他途径获得的构件(如自行开发)。CBSD体现了“购买而不是重新构造”的哲学,将软件开发的重点从程序编写转移到了基于已有构件的组装,以更快地构造系统,减轻用来支持和升级大中型软件系统所需要的维护负担,从而降低软件开发的费用。
请围绕“基于CBSD的软件架构设计与应用”论题,依次从以下3个方面进行论述。
1.概要叙述你参与管理和开发的软件项目及你在其中所承担的主要工作。
2.简要介绍基于构件的软件开发过程模型,具体论述你在所管理和开发的软件工程项目中选择了哪种典型的构件平台并说明理由,如何具体实施的,最终实际效果如何。
3.论述你在该项目实施过程中遇到的问题及解决的办法,以及你进一步应用软件复用技术的有关设想。
[单项选择]软件开发模型(Software Development Model)是指软件开发全部过程、活动和任务的结构框架。渐增模型是在快速开发一个 (1) 的基础上,逐步演化成最终的软件。螺旋模型综合了 (2) 的优点,并增加了 (3) 。喷泉模型描述的是面向 (4) 的开发过程,反映了该开发过程的 (5) 特征。

A. 迭代和有间隙
B. 无迭代和无间隙
C. 无迭代和有间隙
D. 迭代和无间隙

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码