题目详情
题目详情:
发布时间:2023-10-13 14:55:08

[单项选择]Many useful tools and techniques are used in developing schedule()is a schedule network analysis technique that modifies the project schedule to account for limited resource.
A. PERT
B. Resourceleveling
C. Schedulecompression
D. Critical chain method

更多"Many useful tools and techniques ar"的相关试题:

[单项选择]

Quality planning tools are often used to help plan effective quality management activities . ()is one of such tools, which involves company actual or planned project practices to those or other projects to generate ideas for improvement and to provide a basis by which to measure performance.


A. Benchmarking
B. Quality metric
C. Quality checklist
D. Brainstornung
[单项选择]Surface Tools建模可以分为()种方式。
A. 1
B. 2
C. 3
D. 4
[单项选择]

Configuration management system can be used in defining approval levels for authorizing changes and providing a method to validate approved changes.()is not a project configuration management tool.


A. RationalClearcase
B. QualityFunctionDeployment
C. VisualSourceSafe
D. ConcurrentVersions System
[单项选择]Which logical channel is used to transfer signaling messages such as resource reallocation?()
A. PDTCH
B. PTCCH
C. PACCH
D. PBCCH
[单项选择]

Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

空白(1)处填()
A. analysis phase
B. designphase
C. implementationphase
D. maintenancephase
[单项选择]In many industries, consumers return products for warranty repair, replacement, or recycling. ()will become more important as customers demand more flexible and favorable return policies.
A. Parts service
B. Reverse distribution
C. Reverse transportation
D. International logistics
[单项选择]

The()Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project's requirements.


A. Planning
B. Executing
C. Monitoring and Controlling
D. Closing
[单项选择]Which logical channel is used to send RACH bust on uplink and TAs on downlink?()
A. PDTCH
B. PTCCH
C. PACCH
D. PBCCH
[单项选择]How many categories are there in water transport?()
A. 2         
B. 3        
C. 4          
D. Not available in the paragraph
[单项选择]How many stages in the processing of logistics integration?()
A. One
B. Two
C. Three
D. Four
[单项选择]()is used to protect goods not to be deteriorated like food and medicine.
A. packaging  
B. Green Packaging  
C. Vacuum packaging 
D. Special packaging
[单项选择]How many product-related factors are there to influence the transport cost?()
A. Four                 
B. Three                 
C. Two               
D. Five

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码