题目详情
题目详情:
发布时间:2023-10-20 20:26:55

[单项选择]

Configuration management system can be used in defining approval levels for authorizing changes and providing a method to validate approved changes.()is not a project configuration management tool.


A. RationalClearcase
B. QualityFunctionDeployment
C. VisualSourceSafe
D. ConcurrentVersions System

更多"Configuration management system can"的相关试题:

[单项选择]以下对配置管理数据库(configuration management database)的描述正确的是()
A. 包含每一个配置项以及配置项之间关系的详细情况的数据库
B. CMDB常常被认为是构建其它ITTL流程的基础,是事件管理、问题管是获取配置信息的来源
C. CMDB通常可以和财务资产管理之间建立接口
D. 以上都对
[单项选择]()can be used for carrying goods to the pointed place automatically.
A. Automatic belt    
B. Automatic conveyor    
C. Automatic Guided Vehicle   
D. Robot
[名词解释]Hypophysealportal system
[名词解释]Haversian system
[简答题]修改系统变量 Path 的值为%System Root%/ System32;% System Root%;% System Root%/ System32/wbem;D:/
[单项选择]Which logical channel is used to transfer signaling messages such as resource reallocation?()
A. PDTCH
B. PTCCH
C. PACCH
D. PBCCH
[单项选择]若双机config.def文件设置中TYPE参数设置错误,会导致()。
A. 双机通讯故障;
B. 死机;
C. 产生假车次号;
[简答题]简述驱动系统CAN总线和舒适系统CAN总线的区别。
[名词解释]接地装置(earthing system)
[名词解释]系统接地(system earthing)
[名词解释]

英译中:Kanban system


[名词解释]法律体系(legal system)
[单项选择]

Quality planning tools are often used to help plan effective quality management activities . ()is one of such tools, which involves company actual or planned project practices to those or other projects to generate ideas for improvement and to provide a basis by which to measure performance.


A. Benchmarking
B. Quality metric
C. Quality checklist
D. Brainstornung
[单项选择]Many useful tools and techniques are used in developing schedule()is a schedule network analysis technique that modifies the project schedule to account for limited resource.
A. PERT
B. Resourceleveling
C. Schedulecompression
D. Critical chain method
[单项选择]下列对舒适CAN总线的CAN收发器描述错误的是()
A. CAN-H线的高电压平为3.6V
B. CAN-H线的低电压平为0V
C. CAN-L线的高电压为1.4V
D. CAN-L线的低电压平为1.4V
[单项选择]

The()Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project's requirements.


A. Planning
B. Executing
C. Monitoring and Controlling
D. Closing
[单项选择]Which logical channel is used to send RACH bust on uplink and TAs on downlink?()
A. PDTCH
B. PTCCH
C. PACCH
D. PBCCH
[名词解释]

英译中:Order point system


我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码