题目详情
题目详情:
发布时间:2023-10-20 18:19:03

[单项选择]

Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

空白(2)处填()
A. main symptom
B. rootproblem
C. finalblueprint
D. dataspecification

更多"Many of the activities performed du"的相关试题:

[单项选择]

Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

空白(1)处填()
A. analysis phase
B. designphase
C. implementationphase
D. maintenancephase
[单项选择]The integrated logistics activities, equipment and information network, and so on, is called ()
A. logistics integration  
B. Logistics industry  
C. Logistics center  
D. Logistics Park
[单项选择]

Define Activities is the process ofidentifying the specific actions to be performed toproduce the()


A. projectelements
B. work drafts
C. workpackage
D. projectdeliverables
[单项选择]The supply chain activities encompass all associated with the flow and transaction of goods, the flow of information from the raw materials supplier to the end user, as well as the reverse flow of materials and in formation in the()
A. Distribution process
B. Supply chain
C. Enterprise
D. International community
[单项选择]

The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result ofthis analysis and dialog is an()set of requirements.


A. agreed-to
B. agree-to
C. agree-to-do
D. agree-with
[单项选择]()is the most frequent activities in the logistics, but generally adds no value to a product, those operation should be kept to a minimum.
A. Transportation
B. Handling and carrying
C. Marketing forecasts
[单项选择]() are activities that manage the space needed to hold the inventories.
A. Stacking
B. Warehousing and storage
C. Dispatching
D. Goods delivering
[单项选择]

During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised()are necessary.


A. proceedings
B. controls
C. forecastings
D. Prelibations
[单项选择]During the transfer process,()are needed.
A. Hardware such as logistics facilities and equipment (logistics carriers) are needed
B. Information control and standardization
C. Supports from the government and logistics association
D. All of them
[单项选择]Damage()the goods was caused by heavy rain during transit.
A. of
B. for
C. on
D. to
[单项选择]In many industries, consumers return products for warranty repair, replacement, or recycling. ()will become more important as customers demand more flexible and favorable return policies.
A. Parts service
B. Reverse distribution
C. Reverse transportation
D. International logistics
[单项选择]How many stages in the processing of logistics integration?()
A. One                
B. Two       
C. Three               
D. Four
[单项选择]How many categories are there in water transport?()
A. 2         
B. 3        
C. 4          
D. Not available in the paragraph
[单项选择]Many useful tools and techniques are used in developing schedule()is a schedule network analysis technique that modifies the project schedule to account for limited resource.
A. PERT
B. Resourceleveling
C. Schedulecompression
D. Critical chain method

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码