题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2023-11-15 03:32:00

[单项选择] A small business with eight employees has just opened their office in a renovated loft in a busy downtown area. The owner of the building does not want to run any additional wiring beyond power, to preserve the historic nature of the building. Because of this stipulation, almost all tenants in the building have chosen to implement wireless. Which of the following should be the FIRST step in setting up this SOHO network?()
A. Run a wireless site survey
B. Speak to tenants to determine their telephone standards.
C. Install and configure a Gigabit switch.
D. Determine the operating system versions.

更多"A small business with eight employe"的相关试题:

[单项选择]If A small business customer has more sophisticated needs, which Cisco router portfolio would be the best choice?()
A. 7000 series routers
B. integrated services routers
C. small business pro routers
D. small business routers
[单项选择]This place, originally a small town, has been ______ into a modern city.
A. transported
B. transferred
C. transmitted
D. transformed
[单项选择]The country's first fast food chain has ______ opened about 130 stories since it entered the market in 1990.
A. so far
B. in the end
C. year by year
D. sooner or later
[单项选择](The population) of this small town has (more than) (doubled) it in the past (few decades).
A. The population
B. more than
C. doubled
D. few decades
[单项选择]Who has been a teacher for twenty-eight years, using Fast Reader
A. Jim Coxon, CO. Durham, UK.
B. Andrea Bianchi, Milano, Italy.
C. Peter Kaslik, Toronto Ontario, Canada.
D. Alexis Leon, Cochin, Kerala, India.
[单项选择]An administrator has just finished physically replacing the system board in a Windows domain controller. Which of the following must be done before booting the server back into Windows?()
A. Update the time and date in the BIOS.
B. Update the firmware on the SCSI controller.
C. Update the firmware to the latest version.
D. Configure IPMI on the new board.
[单项选择]The project sponsor has just provided the project charter.What is the NEXT thing to do ?()
A. Begin to complete work package
B. Complete scope verificatio
C. Start integrated change contro
D. Start to create management plan
[单项选择]It is a small country, yet has a lot of______ resources.
A. potential
B. unknown
C. secret
D. unlimited
[单项选择]A technician has just installed an upgraded graphics card. The computers power turns off before itfinishes booting. Which of the following is the cause of the problem? ()
A. The monitor cannot display the increased resolution that is a feature of the new graphics card.
B. The power supply does not provide enough wattage to power the new graphics card.
C. The new graphics card is incompatible with the existing processor.
D. The computer does not have enough RAM to support the new graphics card.
[单项选择] A system administrator has just migrated a system from AIX V.4 x to Aix V5.x. The system is up and running and appears to be functioning properly. The following error message was received when running lppchk -v bos.rte V =4 R is >4 bos.rte V>5 bos.rte not installed. 5.1.0 lslpp -l | grep bos.rte shows 5.1.0 Which of the following options is the most likely solution to this problem?()
A. bos.rte is corrupted and needs to be reinstalled.
B. The system administration needs to reboot the system.
C. The /root part of bos.rte was installed but not the user part. Reinstall the missing software.
D. The update CD needs to be applied with the smitty update_all command.
[单项选择]A customer has just received three enterprise systems that support a total of 48 LPARs. Which installation method expedite the process?()
A. Network installation manager
B. Boot from installation media
C. A migration install
D. Copy the system using the HMC
[单项选择]A system administrator has just applied an update to an AIX system to correct a problem, The APAR number is IX49035 and was shipped as part of the PTF number U437542. After applying the APAR fix, the administrator wants to ensure that the fix is applied before informing the system users of the corrected problem. Which of the following commands should the system administrator run to verify that the APAR fix has been applied to the system?()
A. lslpp -f IX49035
B. lslpp -fB U437542
C. instfix -f IX49035
D. instfix -ik IX49035
[多项选择]The network 172.25.0.0 has been divided into eight equal subnets. Which of the following IP addresses can be assigned to hosts in the third subnet if the ip subnet-zero command is configured on the router? ()
A. 172.25.78.243
B. 172.25.98.16
C. 172.25.72.0
D. 172.25.94.255
E. 172.25.96.17
F. 172.25.100.16
[单项选择]The project team has just completed the initial project schedule and budget.The NEXT thing to do is ().
A. begin risk identification
B. begin iterations
C. determine communications requirements
D. create a bar(Gantchart
[单项选择]The project manager has just received a change from the customer that does not affect the project schedule and is easy to complete.What should the project manager do FIRST ?()
A. Make the change happen as soon as possibl
B. Contact the project sponsor for permissio
C. Go to the change control boar
D. Evaluate the other components of the“triple constraint”.
[单项选择]Bill has just visited China to finish writing his new book.

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码