题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2023-12-23 18:10:26

[单项选择]A military member has just returned to the United States from Europe and reports their personaldesktop computer does not work. Which of the following is the MOST logical solution to thisproblem?()
A. The computer is unable to work in the US because of EU licensing arrangements
B. The power supply needs to be replaced with one rated for 110 watts
C. The power supply needs a power inverter to handle the change in cycles
D. The power supply voltage needs to be switched to 110 from 220

更多"A military member has just returned"的相关试题:

[单项选择]The United Nations has launched a new program with a view to ______ poverty in those African countries.
A. extricating
B. eradicating
C. distracting
D. extracting
[单项选择]The 1920s in the United States has been described by many historians as a period of ___________.
A. material failure
B. spiritual frustration
C. political setbacks
D. welfare reform
[单项选择]The United States has some strange laws. For instance, the government permits cigarette companies to advertise their products in magazines and newspapers, yet it______ cigarette commercials on TV.
A. leaves
B. allows
C. demands
D. bans
[单项选择]Because the United States has little tin, () produced in the rest of the world.
A. tin is used
B. it uses tin
C. uses of tin
D. uses tin
[单项选择]A member of Parliament has to spend a great deal of time answering letters from his ______.
A. candidates
B. patriots
C. constituents
D. selectors
[单项选择]Every member of society has to make a______ to struggle for the freedom of the country.
A. pledge
B. warranty
C. petition
D. guarantee
[单项选择]What he has just said has little to do with the question ______ discussion.
A. on
B. under
C. in
D. at
[单项选择]After 15 years in the United States, he has finally decided to______American citizenship.
A. concentrate on
B. apply for
C. look out for
D. appeal on
[单项选择]An administrator has just finished physically replacing the system board in a Windows domain controller. Which of the following must be done before booting the server back into Windows?()
A. Update the time and date in the BIOS.
B. Update the firmware on the SCSI controller.
C. Update the firmware to the latest version.
D. Configure IPMI on the new board.
[单项选择]Although Wales has been united with England for more than 400 years,the Welsh has kept alive().
A. their own language
B. their own literature
C. their own tradition
D. All of the above
[单项选择]What has troubled many families in the United States
A. A not-large-enough income.
B. Nothing is left over to put away.
C. The increasing cost of living.
D. A shortage of certain goods.
[单项选择]The company has just introduced the latest computer technology into the departments of Marketing and Sales.
A. 公司刚刚把最新的计算机技术推广到营销部和销售部。
B. 公司刚刚让市场销售部介绍了最先进的计算机技术。
C. 公司刚刚向市场销售部介绍了最新的计算机技术。
D. 公司刚刚让市场销售部采用最新的计算机技术。
[单项选择]The project sponsor has just provided the project charter.What is the NEXT thing to do ?()
A. Begin to complete work package
B. Complete scope verificatio
C. Start integrated change contro
D. Start to create management plan
[单项选择]A technician has just installed an upgraded graphics card. The computers power turns off before itfinishes booting. Which of the following is the cause of the problem? ()
A. The monitor cannot display the increased resolution that is a feature of the new graphics card.
B. The power supply does not provide enough wattage to power the new graphics card.
C. The new graphics card is incompatible with the existing processor.
D. The computer does not have enough RAM to support the new graphics card.
[单项选择] A system administrator has just migrated a system from AIX V.4 x to Aix V5.x. The system is up and running and appears to be functioning properly. The following error message was received when running lppchk -v bos.rte V =4 R is >4 bos.rte V>5 bos.rte not installed. 5.1.0 lslpp -l | grep bos.rte shows 5.1.0 Which of the following options is the most likely solution to this problem?()
A. bos.rte is corrupted and needs to be reinstalled.
B. The system administration needs to reboot the system.
C. The /root part of bos.rte was installed but not the user part. Reinstall the missing software.
D. The update CD needs to be applied with the smitty update_all command.
[单项选择]A customer has just received three enterprise systems that support a total of 48 LPARs. Which installation method expedite the process?()
A. Network installation manager
B. Boot from installation media
C. A migration install
D. Copy the system using the HMC
[单项选择]A system administrator has just applied an update to an AIX system to correct a problem, The APAR number is IX49035 and was shipped as part of the PTF number U437542. After applying the APAR fix, the administrator wants to ensure that the fix is applied before informing the system users of the corrected problem. Which of the following commands should the system administrator run to verify that the APAR fix has been applied to the system?()
A. lslpp -f IX49035
B. lslpp -fB U437542
C. instfix -f IX49035
D. instfix -ik IX49035
[单项选择]The project team has just completed the initial project schedule and budget.The NEXT thing to do is ().
A. begin risk identification
B. begin iterations
C. determine communications requirements
D. create a bar(Gantchart

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码