题目详情
当前位置:首页 > 职业培训考试
题目详情:
发布时间:2023-09-27 18:57:32

[单项选择]A new floppy drive was just installed into a PC. The drive powers on at system boot but the status LED does not turn off during operation. Which of the following is MOST likely the issue?()
A. The power cable was installed incorrectly and needs to be flipped.
B. The floppy drive was not enabled within the motherboard’s BIOS.
C. The FDD cable was installed incorrectly and needs to be flipped.
D. A Molex power cable was used instead of a Berg cable.

更多"A new floppy drive was just install"的相关试题:

[单项选择]A newly installed floppy drive activity light stays on. Which of the following is the MOST likely problem?()
A. The computer does not support this type of drive.
B. Connector is plugged in backwards.
C. Power is plugged in backwards.
D. All floppies are corrupt.
[单项选择]I'm just trying to recall his name; it's just on the _________ of my tongue.
A. edge
B. tip
C. end
D. front
[单项选择]After installing a new optical drive into a workstation, which of the following will ask for anacknowledgement?()
A. IRQ Manager
B. BIOS
C. Device Manager
D. Hardware Compatibility List
[单项选择]After installing a new SATA hard drive the technician notices the drive is hot to the touch and is giving off a slight odor. Which of the following should the technician do? ()
A. Install a larger fan near the hard drive to cool the system.
B. Clean the drive with compressed air and continue to use it.
C. Remove and replace the drive.
D. Apply more thermal compound and reseat the drive.
[单项选择] A client purchased a new internal hard drive to act as a second drive on a legacy machine. When the client attempts to install the drive, the cable connector on the new drive is not compatible with the available IDE cables. It is determined that the client has purchased a SATA hard drive. Which of the following would the technician recommend as the BEST solution to this situation?()
A. Have the client purchase a SATA compatible system board.
B. Have the client purchase a SATA to IDE conversion kit.
C. Have the client return the drive and purchase an IDE compatible drive.
D. Have the client purchase a SCSI to SATA conversion kit.
[单项选择]New AIX systems arrive without a CDROM drive. All systems do not have the system hardware configuration. Which of the following options is the most appropriate way to install AIX on the systems?()
A. Install CDROM drives or tape drives on the systems because that is the only way to install AIX.
B. Install one system. Take a mksysb from the first system and resotre the mksysb to the remaining systems.
C. Install one system. Mirror rootvg onto a disk from each of the remaining systems.
D. Setup and NIM master and resources.
[单项选择]A technician just finished installing a new printer on an end user’s computer. Which of thefollowing will enable the technician to see the test page option for the printer?()
A. Right-click on the printer and select Properties
B. Double click on the printer icon
C. Right-click on the printer and select Set as Default
D. Right-click on the printer and select Open
[单项选择]An administrator has just installed a new NIC into the server. The system POSTs fine and the NIC is recognized by the OS, but it does not receive an IP address. Which of the following is the MOST likely cause of this?()
A. The NIC is not on the HCL.
B. The driver is incorrect on the server.
C. The patch cable has not been seated properly.
D. The NIC is not seated properly.
[单项选择]A technician has just installed a new power supply into a desktop computer and now the computer will not turn on. Which of the following is the MOST likely cause?()
A. The voltage selector switch on the power supply is set incorrectly.
B. The 3.3v power line is connected to the wrong input on the motherboard.
C. The new power supply voltage rating is too high.
D. The 12v power cord is installed incorrectly.
[单项选择]John has just left New York, but I did not know he{{U}} {{/U}}until yesterday.
A. will leave
B. had been leaving
C. leaves
D. was leaving
[单项选择]A technician has just finished installing a new NIC into a customer’s desktop. Which of thefollowing should the technician do NEXT?()
A. Perform a full system backup.
B. Follow up with the customer, verifying satisfaction.
C. Ask their manager to contact the customer.
D. Perform a complimentary virus scan.
[单项选择]A cisco router is booting and has just completed the POST process.It is now ready to find and load an IOSimage.what function does the router perform next?()
A. It checks the configuration register
B. It attempts to boot from a TFTP server
C. It loads the first image file in flash memory
D. It inspects the configuration file in NVRAM for boot instructions
[单项选择] You have just installed a new web server on the Testking network. You are required to ensure that the web server is accessible from the Internet. The network uses private addressing, so an IP-to-registered address mapping is required.To do this, you enter the following command:TestKing(config)# ip nat inside source static 192.168.2.1 198.18.1.254 You unsuccessfully try to ping the Internet from a PC host on the LAN. During the troubleshooting process, you enter the "show ip nat translations" command but the output is blank. What is the most likely cause of the problem?()
A. The keyword overload is missing from the command.
B. The NAT pool must be defined first.
C. An access list must be defined to create static NAT translations.
D. The interfaces must be configured for NAT.
E. None of the above
[单项选择]You have just purchased a brand new router and wish to have the router prompt you through the initial configuration commands. Which router mode does this describe?()
A. ROM Monitor mode
B. SETUP mode
C. Autoflash mode
D. RXBOOT mode
E. None of the above
[单项选择]Two new PCs will have a DVD-RW drive for support use. The PCs will be used for Point of Salestransactions and everything will be password protected or disabled. Which of the following is the BEST way to disable the DVD-RW drives?()
A. The Registry
B. Device Manager
C. Disk Management
D. The BIOS
[单项选择]A project manager has just been assigned to a new project and has been given the project charter.The FIRST thing the project manager must do is ().
A. create a project scope statement
B. confirm that all the stakeholders have had input into the scope
C. analyze project risk
D. begin work on a project management plan
[单项选择]The writer thinks that the idea of building "New Town" in the U.S. ______.
A. will help to solve the present urban situation
B. will produce the same sorts of results as does in Europe
C. will by no means alleviate the urban problems
D. will prevent the present urban situation from getting worse

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码