更多"If the project had not been planned"的相关试题:
[填空题]The large new space project planned at present is the______.
[单项选择]
Ravi, like many project (), had studied the waterfall model of software development as the primary software life-cycle (). He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in () and not as ().
The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most suitable, an existing process must be () to the new problem.
A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.
Ravi had studied the waterfall model of soft
A. activity
B. procedure
C. process
D. progress
[单项选择]A project team has been arguing for days about the correct way to complete a high level design. This has caused the SPI to fail to 0.89 and has a CPI of 0.9. If the project manager tees the team “we will schedule this discussion for our team meeting next week”. The project manager is ______ .
A. using earned value
B. compromising
C. increase costs even further
D. withdrawing
[单项选择]You are beginning a new project that has been attempted,but unsuccessful,several times in the past few years.Previous projects were cancelled because of “politics”(differing views and direction by key stakeholders of the project).This is an example of______.
A. stakeholder analysis
B. project charter
C. historical information
D. risk identification
[单项选择]________had been planned to raise to help lift Africa from poverty.
A. 20 billion dollars
B. 80 billion dollars
C. 100 billion dollars
D. 120 billion dollars
[填空题]The planned nuclear power station had met strong()from the local residents. (resist)
[单项选择]All things (), the planned trip had to be called off.
A. considered
B. be considered
C. considering
D. having considered
[单项选择]All things _____, the planned trip had to be called off.
A. considered
B. be considered
C. considering
D. having considered
[单项选择]The couple had previously planned to
A. go boating.
B. play golf.
C. go cycling.
D. play tennis.
[单项选择]All things_________, the planned trip had to be called off.
A. considered
B. be considered
C. considering
D. having considered
[单项选择] (20) involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application are
A. A. MetricsB. MeasurementC. BenchmarkingD. Baseline
[单项选择](75) involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application area.
A. Metrics
B. Measurement
C. Benchmarking
D. Baseline
[单项选择]What had they planned to do that night
A. Go to see the match.
B. Go to the park.
C. Go to the concert.