Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

空白(1)处应选择()
A. customers
B. managers
C. users
D. administrators

更多"Ravi, like many project (1) , had s"的相关试题:

[单项选择]

Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

空白(2)处应选择()
A. activity
B. procedure
C. process
D. progress
[单项选择]Which area is the most commodities shipped in water transport?()
A. In international deep sea
B. In lakes
C. In river and canals
D. Coastal ocean
[单项选择]It is possible to predict how much energy and water a building will consume, how much () will be needed
A. matter
B. things
C. material
D. substance
[单项选择]()Which area is the most commodity shipped in water transport?
A. In international deep sea   
B. In lakes     
C. In river and canals     
D. Coastal ocean
[名词解释]Like Dissolves Like(相似相溶)
[名词解释]超级HAD图像传感器
[简答题]什么是exview had ccd?
[简答题]什么是super had ccd?
[简答题]什么是had传感器?
[单项选择](),he had to leave school.
A. Sincehisfather’sunemployment
B. Sincehisfatherwasunemployed
C. Hisfatherwasunemployment
D. Becauseofhisfatherwasunemployment
[单项选择]If business had been carried out to our satisfaction,we()to renew the Agency Agreement.
A. had agreed
B. already agreed
C. shall agree
D. should have agreed
[单项选择]

Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

空白(2)处填()
A. main symptom
B. rootproblem
C. finalblueprint
D. dataspecification

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码