A ()is a collection of projects and other work that are grouped together to facilitate effective management ofthat work to meet strategic business objectives.
In which form of projects origination would the project manager be likely to exercise the most control over Project resources.()
On some projects, especially ones of smaller scope, activity sequencing, activity resource estimating, activity duration estimating, and()are so tightly linkedthat they are viewed as a single process that can be performed by a person over a relatively short period of time.
英译中:Goods collection
A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved.
空白(1)处应选择()英译中:Automatic data collection(ADC)
Project work packages are typically decomposed into smaller components called activities to provide a basis for()scheduling, executing, and monitoring and controllingthe proj ect work.
Organizations perform work to achieve a set of objectives. Generally, work can be categorized as either projects or operations, although the two sometimes are()
The creation ofa work breakdown structure (WBS) is the process of()the major project deliverables.
()is the budgeted amount for the work actually completed on the schedule activity or WBS component during a giving time period.