[单项选择]

()means that every project has a definite beginning and a definite end.


A. Projectphase
B. Unique
C. Temporary
D. Closure

更多"()means that every project has a de"的相关试题:

[单项选择]

()means that every project has a definite beginning and a definite end.


A. Project phase
B. Unique
C. Temporary
D. Closure
[单项选择]

Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the level()


A. independentresource
B. individualworkload
C. workmilestone
D. workpackage
[单项选择]在Project2003中删除任务,需要打开Project文档,并切换到在()视图。
A. 绘图
B. 甘特图
C. 列表
D. 工具
[单项选择]

Project selection methods involve measuring value or attractiveness to the project owner or sponsor and may include other organizational decision criteria ()is not a project selection method.


A. Benefitcontribution
B. Expertjudgment
C. Scoringmodels
D. Flowcharting
[单项选择]

Project work packages are typically decomposed into smaller components called activities to provide a basis for()scheduling, executing, and monitoring and controllingthe proj ect work.


A. reviewing
B. estimating
C. auditing
D. expecting
[单项选择]

Project Quality Management processes include all the activities of the()that determine quality policies, objectives and responsibilities so that the project will satisfy theneeds for which it was undertaken.


A. Project
B. project management team
C. performingorganization
D. customer
[单项选择]

Project Quality Management must address the management of the project and the()ofthe project. While Project Quality Management applies to all projects,regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.


A. performance
B. process
C. product
D. object
[多项选择]K-means算法叙述正确的是()
A. 在K-means算法中K是事先给定的,这个K值的选定是非常难以估计的
B. 在K-means算法中,首先需要根据初始聚类中心来确定一个初始划分,然后对初始划分进行优化
C. 对于一个类中的每个对象,在其给定半径的领域中包含的对象不能少于某一给定的最小数目
D. 从K-means算法框架可以看出,该算法需要不断地进行样本分类调整,不断地计算调整后的新的聚类中心,因此当数据量非常大时,算法的时间开销是非常大的
[单项选择]K-means算法的缺点不包括()
A. K必须是事先给定的
B. 选择初始聚类中心
C. 对于“噪声”和孤立点数据是敏感的
D. 可伸缩、高效
[单项选择]

Project () Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.


A. Integration
B. Scope
C. Configuration
D. Requirement
[单项选择]

The inputs of developing project management plan do not include()


A. project charter
B. stakeholder management strategy
C. project scope statement
D. outputs from planning processes
[单项选择]

Developing the project schedule is often an iterative process. It determines the planned start and finish dates for project activities and milestones. Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to()progress.


A. analyze
B. track
C. level
D. extend
[单项选择]

Performing()involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.


A. qualityplanning
B. qualityassurance
C. qualityperformance
D. quality control
[单项选择]

Project()Management includes the processes required to ensure that theproj ect includes all the work required, and only the work required, to complete the project successfully.


A. Integration
B. Scope
C. Configuration
D. Requirement
[多项选择]K-means算法的叙述正确的是()
A. 在K-means算法中K是事先给定的,这个K值的选定是非常难以估计的
B. 在K-means算法中,首先需要根据初始聚类中心来确定一个初始划分,然后对初始划分进行优化
C. 对于一个类中的每个对象,在其给定半径的领域中包含的对象不能少于某一给定的最小数目的新的聚类心,因此当数据量非常大时,算法的时间开销是非常大的
[单项选择]

A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved.

空白(1)处应选择()
A. phases
B. processes
C. segments
D. pieces
[单项选择]

()involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application area.


A. Metrics
B. Measurement
C. Benchmarking
D. Baseline

我来回答:

购买搜题卡查看答案
[会员特权] 开通VIP, 查看 全部题目答案
[会员特权] 享免全部广告特权
推荐91天
¥36.8
¥80元
31天
¥20.8
¥40元
365天
¥88.8
¥188元
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《购买须知》
立即支付 系统将自动为您注册账号
请使用微信扫码支付

订单号:

请不要关闭本页面,支付完成后请点击【支付完成】按钮
恭喜您,购买搜题卡成功
重要提示:请拍照或截图保存账号密码!
我要搜题网官网:https://www.woyaosouti.com
我已记住账号密码